SuDS in London - a guide
sustainable-urban-drainage-november-2016
sustainable-urban-drainage-november-2016
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Design process diagram adapted from CIRIA C753 The <strong>SuDS</strong> Manual<br />
Local plann<strong>in</strong>g policies<br />
National/local <strong>SuDS</strong><br />
guidance & standards<br />
Environmental Impact<br />
Assessment<br />
Community engagement<br />
Pre-application<br />
discussions<br />
Development<br />
masterplann<strong>in</strong>g<br />
Outl<strong>in</strong>e plann<strong>in</strong>g<br />
permission & conditions<br />
Set strategic surface water<br />
management objectives<br />
Conceptual dra<strong>in</strong>age<br />
design<br />
Outl<strong>in</strong>e dra<strong>in</strong>age design<br />
Site Flood Risk/<br />
Consequence Assessment<br />
Initial data collection &<br />
analysis<br />
Detailed data collection<br />
and analysis<br />
Stakeholder engagement<br />
(directly <strong>in</strong>fluenc<strong>in</strong>g dra<strong>in</strong>age design)<br />
Full plann<strong>in</strong>g<br />
permission<br />
Detailed dra<strong>in</strong>age<br />
design<br />
Key<br />
Build<strong>in</strong>g regulators<br />
approval<br />
Dra<strong>in</strong>age system approvals<br />
& construction consents<br />
Plann<strong>in</strong>g process and<br />
requirements<br />
Dra<strong>in</strong>age design and<br />
construction processes<br />
Construction,<br />
<strong>in</strong>spection & approval<br />
Satisfactory scheme<br />
construction<br />
Plann<strong>in</strong>g processes<br />
and requirements not<br />
usually relevant for<br />
small sites<br />
Dra<strong>in</strong>age design and<br />
construction processes<br />
not usually relevant for<br />
small sites<br />
Dra<strong>in</strong>age system<br />
management<br />
Plann<strong>in</strong>g data <strong>in</strong>puts<br />
Plann<strong>in</strong>g data <strong>in</strong>puts<br />
not always required<br />
Data <strong>in</strong>puts for dra<strong>in</strong>age<br />
and construction<br />
processes<br />
128 6 Implementation