BS Concret<br />

Order Valu<br />

Case study 10 –<br />

Permeable pav<strong>in</strong>g<br />

Location<br />

<strong>London</strong> Borough of Newham<br />

Date<br />

2012 (Temporary)<br />

<strong>SuDS</strong> components<br />

Temporary permeable pav<strong>in</strong>g <strong>in</strong>stallation<br />

Objectives<br />

To provide a coach park that would have a<br />

m<strong>in</strong>imal impact on the environment so the<br />

site could be returned to its orig<strong>in</strong>al use as<br />

sports fields after the 2012 Games.<br />

Outcome<br />

The sub-base was designed to support<br />

Marshalls Priora permeable concrete<br />

blockpav<strong>in</strong>g, us<strong>in</strong>g graded crushed rock<br />

aggregate to provide structural strength,<br />

<strong>in</strong>tegrity and voidage for attenuation.<br />

This was placed on a geogrid for additional<br />

strength. Creat<strong>in</strong>g a void at the jo<strong>in</strong>t<br />

between the Priora blocks at the surface<br />

allowed water to pass through the<br />

pavement at source. The jo<strong>in</strong>t void was<br />

filled with 2-6mm clean stone to provide<br />

a permeability rate of 18,750L/s/ha, to<br />

cope with any storm event. No additional<br />

positive dra<strong>in</strong>age was required.<br />

Images courtesy of Marshalls<br />

Installation complete<br />

Aerial view of site under construction<br />

58 3 <strong>SuDS</strong> components