09.01.2017 Views

SuDS in London - a guide

sustainable-urban-drainage-november-2016

sustainable-urban-drainage-november-2016

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.6 Isl<strong>in</strong>gton Town Hall<br />

Location<br />

Upper Street<br />

<strong>London</strong> Borough of Isl<strong>in</strong>gton<br />

Extent<br />

1,000m²<br />

Cost<br />

£100,000<br />

Date<br />

2011<br />

Credits<br />

<strong>London</strong> Borough of Isl<strong>in</strong>gton<br />

J&L Gibbons<br />

<strong>SuDS</strong> components<br />

Permeable pav<strong>in</strong>g<br />

Large specie tree plant<strong>in</strong>g<br />

De-pav<strong>in</strong>g<br />

Before<br />

Summary<br />

Transformation of a car park <strong>in</strong>to a<br />

green public space for community and<br />

ceremonial events.<br />

Project description<br />

Isl<strong>in</strong>gton Town Hall is on Upper Street<br />

which is populated by shops, bars and<br />

cafes and attracts heavy footfall. Before<br />

the redesign, the forecourt of the town<br />

hall was a car park with impermeable<br />

surfaces. This had implications for the<br />

management of stormwater runoff<br />

onto Upper Street’s carriageway and for<br />

comb<strong>in</strong>ed sewer overflow.<br />

A political <strong>in</strong>centive to ‘green’ the town<br />

hall forecourt <strong>in</strong>itiated the scheme as part<br />

of Isl<strong>in</strong>gton’s susta<strong>in</strong>able agenda.<br />

This was coupled with recognition of<br />

the poor presentation of the build<strong>in</strong>g to<br />

the street. These were key factors <strong>in</strong> the<br />

project ga<strong>in</strong><strong>in</strong>g support.<br />

It shows how small public realm<br />

<strong>in</strong>terventions can address car park<strong>in</strong>g<br />

issues and storm water runoff, while<br />

transform<strong>in</strong>g a space and improv<strong>in</strong>g the<br />

public realm.<br />

Objectives<br />

• Enhance the town hall’s sett<strong>in</strong>g<br />

as a key civic location<br />

• Provide a high quality public<br />

realm on Upper Street<br />

• Address car park<strong>in</strong>g issues,<br />

while ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g a suitable<br />

sett<strong>in</strong>g for ceremonial events<br />

• Plant large species trees<br />

for long-term benefit<br />

Actions and results<br />

• Permeable pav<strong>in</strong>g surfaces allow water<br />

to seep directly <strong>in</strong>to the sub-base,<br />

thereby redirect<strong>in</strong>g excess and polluted<br />

water away from the comb<strong>in</strong>ed sewer<br />

• Trees and plant<strong>in</strong>g provide canopy<br />

cover, <strong>in</strong>creas<strong>in</strong>g the <strong>in</strong>terception of<br />

ra<strong>in</strong>water and enhanc<strong>in</strong>g biodiversity<br />

• De-paved and planted surfaces<br />

<strong>in</strong>creases attenuation by<br />

maximis<strong>in</strong>g areas for <strong>in</strong>filtration<br />

87 5 Case studies

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!