09.01.2017 Views

SuDS in London - a guide

sustainable-urban-drainage-november-2016

sustainable-urban-drainage-november-2016

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.10 Queen Carol<strong>in</strong>e Estate<br />

Location<br />

Hammersmith<br />

<strong>London</strong> Borough of Hammersmith & Fulham<br />

Extent<br />

0.23ha<br />

Cost<br />

£226,000 (total scheme)<br />

Date<br />

2015<br />

Credits<br />

Groundwork<br />

<strong>London</strong> Borough of Hammersmith<br />

& Fulham<br />

Greater <strong>London</strong> Authority<br />

EU LIFE+ Programme<br />

<strong>SuDS</strong> components<br />

Green roofs<br />

Bioretention bas<strong>in</strong><br />

Detention bas<strong>in</strong><br />

Permeable pav<strong>in</strong>g<br />

Summary<br />

Estate regeneration through <strong>in</strong>tegrated<br />

<strong>SuDS</strong> design.<br />

Project description<br />

Queen Carol<strong>in</strong>e Estate is bound by the<br />

River Thames and the Hammersmith<br />

Flyover. The estate is a mixture of paved<br />

carriageway surfaces for access and<br />

park<strong>in</strong>g, plus grassed areas. The challenges<br />

of the site made it an appropriate<br />

development for the LIFE+ Climate<br />

proof<strong>in</strong>g social hous<strong>in</strong>g project that<br />

provides low cost, retrofitted <strong>SuDS</strong><br />

to improve community resilience to<br />

climate change.<br />

Objectives<br />

• Reduce surface water flood<br />

risk and frequency<br />

• Improve the condition of the<br />

estate’s <strong>in</strong>frastructure<br />

• Address deprivation and vulnerability<br />

to climate change on the estate<br />

Garage green roof<br />

Images courtesy of Groundwork<br />

After<br />

95 5 Case studies

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!