SuDS in London - a guide
sustainable-urban-drainage-november-2016
sustainable-urban-drainage-november-2016
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2.8 Retrofitt<strong>in</strong>g<br />
Many of the potential <strong>SuDS</strong> opportunities<br />
<strong>in</strong> <strong>London</strong> are retrofits, ie, <strong>in</strong>stall<strong>in</strong>g the<br />
components <strong>in</strong>to the exist<strong>in</strong>g streetscape<br />
and public realm. Depend<strong>in</strong>g on the<br />
available space and prevail<strong>in</strong>g condition,<br />
exist<strong>in</strong>g streetscapes can be adapted or<br />
retrofitted with a variety of <strong>in</strong>terventions,<br />
improv<strong>in</strong>g the quality of the public realm<br />
where possible.<br />
When retrofitt<strong>in</strong>g <strong>SuDS</strong>, it is important to<br />
consider how the space will be used. If<br />
wheeled goods handl<strong>in</strong>g, for example, is<br />
expected, the design will need to address<br />
this <strong>in</strong> terms of smoothness, access and<br />
potential obstruction.<br />
The follow<strong>in</strong>g may offer opportunities to<br />
retrofit <strong>SuDS</strong>:<br />
• Dur<strong>in</strong>g annual road ma<strong>in</strong>tenance works<br />
• Integrated as part of development,<br />
redevelopment or regeneration<br />
• As part of <strong>in</strong>vestment <strong>in</strong> the<br />
public transport network,<br />
such as station forecourts<br />
• Improv<strong>in</strong>g <strong>London</strong>’s cycle route<br />
<strong>in</strong>frastructure, eg, M<strong>in</strong>i-Hollands.<br />
• As community <strong>in</strong>itiatives,<br />
address<strong>in</strong>g private households,<br />
<strong>in</strong>clud<strong>in</strong>g front gardens<br />
The opportunities – which will be<br />
determ<strong>in</strong>ed above and below ground<br />
– and constra<strong>in</strong>ts are illustrated <strong>in</strong><br />
Chapter 4. Retrofit <strong>in</strong>itiatives, such as<br />
Twenty 4 Twenty, Greenstreets, <strong>SuDS</strong> for<br />
Schools and Life+ Climate Proof<strong>in</strong>g for<br />
Hous<strong>in</strong>g Landscapes, offer partnership<br />
opportunities to design and deliver <strong>SuDS</strong>.<br />
• Dur<strong>in</strong>g road reconstruction<br />
or resurfac<strong>in</strong>g<br />
• As part of road dra<strong>in</strong>age improvements<br />
Road closure, permeable surfac<strong>in</strong>g and tree<br />
plant<strong>in</strong>g <strong>in</strong> Waltham Forest M<strong>in</strong>i-Holland<br />
• As part of planned road modernisation<br />
24 2 The <strong>London</strong> context