09.01.2017 Views

SuDS in London - a guide

sustainable-urban-drainage-november-2016

sustainable-urban-drainage-november-2016

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Benefits<br />

• Can withstand a one <strong>in</strong> 100<br />

year + 30% storm event<br />

• Runoff from 750m² of roof and 165m²<br />

from roads are attenuated <strong>in</strong> the scheme<br />

• 12-hour delay between ra<strong>in</strong>fall event<br />

and pressure record<strong>in</strong>g <strong>in</strong> the bas<strong>in</strong><br />

• 16-hour delay between peak<br />

ra<strong>in</strong>fall and peak pressure <strong>in</strong><br />

ra<strong>in</strong>fall bas<strong>in</strong> for first event<br />

Lessons learned<br />

• Monitor<strong>in</strong>g system <strong>in</strong>stalled and<br />

used to support the design of future<br />

<strong>SuDS</strong> retrofit projects should try to<br />

direct flows from known problem<br />

areas <strong>in</strong>to bioretention bas<strong>in</strong>s<br />

to prevent surface flood<strong>in</strong>g<br />

After<br />

• Ma<strong>in</strong>tenance agreements need<br />

to be <strong>in</strong> place along with a<br />

clear method of report<strong>in</strong>g<br />

Channel detail<br />

86 5 Case studies

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!