5.2 Upm<strong>in</strong>ster Bridge swale<br />

Location<br />

Upm<strong>in</strong>ster Bridge<br />

<strong>London</strong> Borough of Haver<strong>in</strong>g<br />

Extent<br />

400m²<br />

Cost<br />

Trial scheme<br />

Date<br />

2015<br />

Credits<br />

<strong>London</strong> Underground<br />

Environment Agency<br />

Green Infrastructure Agency<br />

Environmental Scientifics Group<br />

Environmental Protection Group<br />

SEL Environmental<br />

ITM Monitor<strong>in</strong>g<br />

<strong>SuDS</strong> components<br />

Swale<br />

Outfall/runoff <strong>in</strong>terception<br />

Summary<br />

Swale construction for <strong>in</strong>creased on-site<br />

attenuation and water treatment.<br />

Project description<br />

Upm<strong>in</strong>ster Bridge Station serves the<br />

District L<strong>in</strong>e and is 3.5km west of the<br />

M25. The adjacent River Ingrebourne<br />

is vulnerable to flood<strong>in</strong>g and has been<br />

deemed an at-risk river by the<br />

Environment Agency. The river is with<strong>in</strong><br />

the sub-catchment area of the l<strong>in</strong>e and<br />

to a lesser extent, nearby roads, with<br />

implications for both pollution and bank<br />

stabilisation of the River Ingrebourne and<br />

reliability of the l<strong>in</strong>e.<br />

A <strong>London</strong> Underground Power Upgrade<br />

Project, <strong>in</strong>volv<strong>in</strong>g the construction of a<br />

new substation, presented the opportunity<br />

to trial an experimental <strong>SuDS</strong> scheme. This<br />

<strong>in</strong>cluded two swales with associated tanks<br />

and v-notch weirs. One receives water<br />

from the new substation roof, the other<br />

from adjacent <strong>London</strong> Underground tracks.<br />

Fund<strong>in</strong>g was provided by the Environment<br />

Agency with a <strong>London</strong> Underground<br />

Limited contribution <strong>in</strong> k<strong>in</strong>d.<br />

No disruption to service dur<strong>in</strong>g construction<br />

400m 2 swale under construction<br />