28.04.2020 Views

YME Engineering Course

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

S. GRAPHIC BUILDER

Figure: Items Added When Setting the Bitmap Change

When the change bitmap enabled is set, the [Preview] button is enabled. Use this

button to display the bitmap preview dialog.

Figure: Bitmap Preview Dialog Box

Select the changed bitmap file, as a file selection common dialog is displayed

when the [Open] button is pressed. The selected bitmap is displayed on the

bitmap preview dialog. Use the [Close] button to close the bitmap preview dialog.

S.5.8 DATA TYPE

Specify the data type.

The data types include [Process Data], [Recipe Data (Unit Name Specification)],

[Recipe Data (Batch ID Specification)].

S.5.9 CONTINUATION/NON-CONTINUATION OF GRAPHIC MODIFIER

This sets whether or not to continue testing of the graphic modifier conditional

formula. In the default setting, the testing is performed in sequence, starting from

the graphic modifier conditional formula of the condition number 1. If the

condition is satisfied, the change action will be executed and the graphic modifier

conditional formula testing is then completed. When the continuation of testing is

selected, the graphic modifier conditional formula testing is continued even after

the condition is satisfied. In this case, all change actions associated with satisfied

conditions are executed. However, when multiple conditions with the same

change action are satisfied, the execution of the condition of a larger number will

precede.

YME Training Center

S-34

CS3KR3-ENG 1 ST Edition Jan 2002

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!