28.04.2020 Views

YME Engineering Course

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T. PROJECT COMMON DEFINITION

Specify the following items:

♦ Monitoring Range

Specify the scope of data to be read. Specify a plant hierarchy name.

♦ Operation and Monitoring Range

Specify the scope of data to be read and written. Specify a plant hierarchy

name. Operation and Monitoring Range should be within the Monitoring

Range.

♦ Window Range

Specify a window name a user can operate and monitor after user-in.

Specify window name.

♦ Acknowledgment

Specify the scope of acknowledged process alarms. Specify a plant

hierarchy name.

♦ Process Message Receiving

Specify the scope of monitored messages. Specify a plant hierarchy

name.

♦ System Alarm Receiving

Specify the scope of monitored system alarms by station name.

The following keywords are used in setting operation and monitoring

scope:

♦ ALL

Operation and monitoring rights on all stations and windows connected to

the control bus

♦ NONE

No monitoring rights on any station

When setting operation and monitoring rights on designated station names or

window names, the wild card character “ * ” can be used instead of part or all

characters in a character string.

The default setting is that all stations and windows are within the operation and

monitoring range.

T.13.7 EXCLUSIVE DEFINITION

Exclude Operation, Exclude Operation and Monitoring, Exclude

Acknowledgment, Exclude Process Message, Exclude System Alarm

Specify the following items:

♦ Exclude Operation

Specify the scope of data not to be written. Specify a plant hierarchy

name.

♦ Exclude Operation and Monitoring

YME Training Center

T-27

CS3KR3-ENG 1 ST Edition Jan 2002

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!