18.02.2013 Views

Timing, hosts and locations of (grouped) events of NanoImpactNet

Timing, hosts and locations of (grouped) events of NanoImpactNet

Timing, hosts and locations of (grouped) events of NanoImpactNet

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Practical risk assessment <strong>of</strong> NMs with a reasonable<br />

balance between health hazards <strong>and</strong> exposure data.<br />

KEY BENEFITS<br />

• Cost-effective tools for safer manufacturing processes.<br />

• Primary prevention <strong>of</strong> potential risks that can occur<br />

during worker manufacturing or customer use.<br />

4 Organisation <strong>of</strong> SANOWORK<br />

The overall work plan is designed for 42 operational months <strong>and</strong><br />

comprises 7 Work Packages (WPs). A schematic representation <strong>of</strong><br />

the work plan is reported in Figure 1.<br />

Figure 1: Sanowork WPs description (Pert chart).<br />

An exposure scenario as requested by REACH deals with the<br />

collection <strong>of</strong> substance/product properties, operational conditions,<br />

risk management measures to take the exposure <strong>of</strong> workers to<br />

NMs under hazardous level. The SANOWORK S/T methodology is<br />

driven by the REACH definition <strong>of</strong> exposure scenario <strong>and</strong><br />

establishes a synergy between WPs 2-6, in order to take as much<br />

indications as possible for the development <strong>of</strong> a safe worker<br />

exposure scenario.<br />

WP1 <strong>and</strong> WP8 are the Administrative <strong>and</strong> Scientific management<br />

workpackages, respectively. In this WP, we will implement a<br />

rigorous administrative management process to ensure the timely<br />

achievement <strong>of</strong> the project deliverables <strong>and</strong> the scientific<br />

excellence <strong>of</strong> each workpackage task.<br />

Table 1 Workpackages (WP) <strong>of</strong> SANOWORK<br />

WP Title Topic<br />

1 Administrative<br />

Management<br />

This workpackage is aimed to:<br />

NanoSafetyCluster - Compendium 2012<br />

WP2 is related to the assessment <strong>and</strong> analysis <strong>of</strong> the risks caused<br />

by the occupational exposure to SANOWORK target NMs, in<br />

different stages <strong>of</strong> their manufacturing life cycle. LEITAT will<br />

develop databases which will be versatile to include new data from<br />

other sources. The essential information on NMs characteristics,<br />

exposure potential <strong>and</strong> toxicity to be used for the risk assessment<br />

will be included from literature sources as well as from data<br />

generated in the project by WP3 <strong>and</strong> WP5 worker exposure <strong>and</strong><br />

toxicological hazard characterization, respectively. The risk<br />

analysis will provide the inputs to: 1) evaluate the effectiveness <strong>of</strong><br />

existing or proposed risk remediation strategies; 2) assist UL in<br />

transferring information to insurance companies.<br />

An occupational exposure assessment strategy (WP3), will be<br />

developed by INERIS. INERIS will collect exposure data 1) <strong>of</strong>f-line,<br />

by semi-quantitative approach on as-delivered NMs <strong>and</strong> on chronic<br />

or accidental scenarios, at the lab scale (data useful for the so<br />

called RISK 1 assessment); 2) on-site, by a quantitative approach on<br />

processing lines (data useful for the so called RISK 2 assessment).<br />

It will also apply a control b<strong>and</strong>ing approach to risk assessment<br />

<strong>and</strong> management, providing data useful for a comparison between<br />

existing <strong>and</strong> proposed risk remediation strategies.<br />

The toxicological hazards (WP5) will be assessed by IOM, UNIPR<br />

<strong>and</strong> UNIPI.<br />

ISTEC will develop “Design Options” based Risk Remediation<br />

Strategies <strong>and</strong> evaluate NMs functional properties <strong>and</strong> their<br />

performances in relation to specific steps <strong>of</strong> the process. UL will<br />

assist ISTEC, INERIS, UNIPR, UNIPI <strong>and</strong> IOM providing a physicochemical<br />

characterization <strong>of</strong> NMs.<br />

PCHEM, NIRO, ELM, COL <strong>and</strong> LEITAT will develop industrial<br />

demonstration platforms to prove the integration <strong>of</strong> proposed risk<br />

control extra steps in different pilot lines (WP6), <strong>and</strong> make the<br />

industrial scenarios available for exposure assessment on-site.<br />

ISTEC will supervise the implementation <strong>of</strong> target processing lines<br />

<strong>and</strong> will assist UL for COST/BENEFIT evaluation. The results <strong>of</strong> the<br />

risk analysis (WP2) merged with COST/BENEFIT evaluation (WP6)<br />

<strong>of</strong> the proposed strategies will represent the basis for the<br />

definition <strong>of</strong> the safe worker exposure scenarios, tailored for each<br />

<strong>of</strong> the target processing line.<br />

In WP7 the results <strong>and</strong> other outputs <strong>of</strong> the project will be<br />

disseminated internally <strong>and</strong> externally, after appropriate<br />

intellectual property protections, as <strong>and</strong> when needed. The results<br />

<strong>of</strong> risk analysis <strong>and</strong> COST/BENEFIT evaluation will be disseminated<br />

<strong>and</strong> used to inform the industrial partners about the strategies to<br />

implement in their processes, in order to create a safer workplace<br />

environment. Sanowork is structured <strong>and</strong> organized around 4<br />

technical Work Packages (WP2-6), beside project management <strong>and</strong><br />

dissemination/exploitation <strong>of</strong> results (WP1, WP8 <strong>and</strong> WP7)<br />

- coordinate <strong>and</strong> manage the administrative, financial <strong>and</strong> legal-contractual activities <strong>of</strong> the project<br />

- ensure an accurate <strong>and</strong> on-time communication flow with the European Commission (EC) <strong>and</strong> the<br />

Compendium <strong>of</strong> Projects in the European NanoSafety Cluster 257

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!