82<br />

As a result <strong>of</strong> the audit, DECC provided verbal feedback <strong>and</strong> sent three warning letters to Forests NSW<br />

outlining the issues <strong>of</strong> non-compliance identified. DECC also required that remedial work be carried out<br />

at twelve locations.<br />

Lower North East (LNE) region<br />

In the LNE region DECC made four audits. EPL applied to 25 forestry operations, there were<br />

208 operations where harvesting occurred without EPL coverage <strong>and</strong> TSL applied to 233 forestry<br />

operations.<br />

The audits identified 88 non-compliances <strong>of</strong> EPL best practice conditions including:<br />

water flow issues with road drainage<br />

waste left at logging sites<br />

trees felled within protection zone<br />

incorrect marking up drainage lines <strong>and</strong> filter strips<br />

a culvert pipe blockage<br />

repeated instances <strong>of</strong> administration errors, for example incorrect or incomplete planning<br />

documents<br />

incorrect or insufficient drainage structures including drainage feature crossings <strong>and</strong> road<br />

drainage structures.<br />

DECC identified 41 non-compliances against TSL, which included:<br />

no/insufficient submission <strong>of</strong> TSL non-compliances<br />

harvesting machinery entering area <strong>of</strong> rainforest<br />

insufficient retention <strong>of</strong> Riparian Habitat Protection Zones<br />

damaged recruitment <strong>and</strong> habitat trees<br />

insufficient or incomplete surveys for threatened species.<br />

As a result <strong>of</strong> these auditing activities in the LNE forest region, DECC provided feedback <strong>and</strong> sent<br />

three warning letters to Forests NSW regarding non-compliance with licence conditions. Forests NSW<br />

was required to carry out remedial work at 10 sites <strong>and</strong> seek expert soil conservation advice on four<br />

occasions. DECC issued Forests NSW with two clean-up notices <strong>and</strong> two penalty notices for audits<br />

made between 1 July 2006 <strong>and</strong> 30 June <strong>2007</strong>.<br />

Forests NSW was also required to make one engineering assessment for LNE region.<br />

Southern region (South Coast sub-region)<br />

EPL coverage applied to 63 Forests NSW operations in the Southern region, there were 14 operations<br />

where harvesting occurred without EPL coverage <strong>and</strong> TSL applied to 77 forestry operations.<br />

NSW FOREST AGREEMENTS AND INTEGRATED FORESTRY OPERATIONS APPROVALS