110<br />
Due date Region FA section Milestone <strong>Progress</strong><br />
Cultural heritage<br />
1999 1 October<br />
UNE,<br />
LNE,<br />
Eden<br />
2.8<br />
2002 30 June Sthn 2.8<br />
1999 1 April<br />
2001 1 April<br />
UNE,<br />
LNE,<br />
Eden<br />
UNE,<br />
LNE,<br />
Eden<br />
2.7 (E)<br />
2.8<br />
2.7 (E)<br />
2.8<br />
2002 31 August Sthn 2.8<br />
Annually<br />
UNE,<br />
LNE,<br />
Eden<br />
Sthn<br />
2.7 (E)<br />
2.8<br />
2.7 (E)<br />
Cultural heritage management guidelines for SFNSW<br />
to be attached to the IFOA.<br />
SFNSW cultural heritage management guidelines<br />
should be attached to the IFOA.<br />
NPWS to review its cultural heritage guidelines <strong>and</strong><br />
ensure consistency with the principles contained in<br />
CRA project reports prepared by the Cultural Heritage<br />
Working Group (2000a <strong>and</strong> b).<br />
Finalisation <strong>of</strong> SFNSW policy on Indigenous <strong>and</strong> non-<br />
Indigenous cultural heritage.<br />
Finalisation <strong>of</strong> policy on Aboriginal <strong>and</strong> non-Aboriginal<br />
cultural heritage (SFNSW).<br />
<strong>Report</strong> on cultural heritage performance through<br />
annual report, State <strong>of</strong> the <strong>Environment</strong> reports that<br />
publish against performance indicators <strong>and</strong> provide<br />
access to the outcomes <strong>of</strong> performance reviews.<br />
Completed<br />
Cultural heritage guidelines have been attached to the LNE, UNE <strong>and</strong> Eden IFOAs.<br />
Completed<br />
Cultural heritage guidelines have been attached to the Southern IFOA.<br />
Completed<br />
Cultural heritage policies endorsed by the NPWS Executive include its Cultural Heritage Strategic Policy, Consultation Policy, Cultural<br />
Heritage Information Policy <strong>and</strong> Guidelines for the Assessment <strong>of</strong> Impact on Heritage Places. These policies are consistent with the<br />
principles contained in the CRA/RFA project reports: Protective Mechanisms for Cultural Heritage – Generic Version (Cultural<br />
Heritage Working Group 2000a) <strong>and</strong> Protective Mechanisms for Cultural Heritage – Lower North East Region (Cultural Heritage<br />
Working Group, 2000b). Ongoing review <strong>of</strong> PWG statewide guidelines is also consistent with the principles contained in the abovementioned<br />
reports.<br />
Completed<br />
Forests NSW has completed policies for Aboriginal <strong>and</strong> non-Aboriginal cultural heritage <strong>and</strong> they are included in the ESFM Plans.<br />
They state that: ‘Forests NSW will protect <strong>and</strong> manage aboriginal <strong>and</strong> non aboriginal cultural heritage values on State forests in<br />
cooperation with the community’. The ESFM Plans are located at: www.dpi.nsw.gov.au/forests/management/esfm<br />
Forests NSW state-wide Aboriginal Cultural Heritage management policy has been incorporated into Operational Guidelines for<br />
Aboriginal Cultural Heritage Management Policy <strong>and</strong> guidelines for due diligence <strong>and</strong> documentation <strong>of</strong> minimum st<strong>and</strong>ards to assess<br />
impacts, locate <strong>and</strong> manage Aboriginal sites <strong>and</strong> places; <strong>and</strong> processes to address issues relevant to Aboriginal people was prepared<br />
by Forests NSW in consultation with DPI Aboriginal Liaison <strong>and</strong> Cultural Heritage Unit during March 2006 <strong>and</strong> approved 9 May 2006,<br />
(Unpublished) Forests NSW, Sydney.<br />
Completed<br />
Refer to milestone above.<br />
Implemented<br />
Cultural heritage performance <strong>and</strong> achievements are outlined in DECC’s annual report. More detailed performance indicators for<br />
cultural heritage are included in State <strong>of</strong> the Parks reporting. Forests NSW reports on cultural heritage performance <strong>and</strong> indicators<br />
within its SEEing <strong>Report</strong> <strong>2007</strong>– <strong>2008</strong>. Forests NSW, Pennant Hills NSW. Forests NSW <strong>and</strong> DECC also contribute significant<br />
information to this report each year, which includes cultural heritage indicators.<br />
NSW FOREST AGREEMENTS AND INTEGRATED FORESTRY OPERATIONS APPROVALS