Again using a roller, apply an even top coat of catalyzed resin at the minimum rate<br />

specified by the resin manufacturer immediately following embedment of the fleece,<br />

ensuring full saturation of the fleece. Ensure that the flashing resin is applied to extend<br />

beyond the fleece (maximum 0.25 inch (6 mm)). Remove the tape before the catalyzed<br />

resin sets. Make allowances for saturation of roller covers <strong>and</strong> application equipment.<br />

4. Should work be interrupted for more than 12 hours or the surface of the catalyzed resin<br />

becomes dirty or contaminated by the elements, wipe the surface to be lapped with new<br />

flashing resin using the specified cleaner/solvent. Allow the surface to dry for a<br />

minimum 20 minutes <strong>and</strong> a maximum 60 minutes before continuing work.<br />

B. Field Membrane Application<br />

1. Using the specified cleaner/solvent, wipe flashing membrane surfaces to be lapped with<br />

field membrane. Allow the surface to dry for a minimum 20 minutes before continuing<br />

work.<br />

2. Apply an even, generous base coat of field membrane resin using a roller at the<br />

minimum rate specified by the resin manufacturer to prepared surfaces. Work the fleece<br />

into the wet, catalyzed resin using a roller to fully embed the fleece in the resin <strong>and</strong><br />

remove trapped air. Lap fleece layers a minimum of 2 inch (5 cm) <strong>and</strong> apply an<br />

additional coat of catalyzed resin between layers of overlapping fleece. Again using a<br />

roller, apply an even top coat of catalyzed resin at the minimum rate specified by the<br />

resin manufacturer immediately following embedment of the fleece, ensuring full<br />

saturation of the fleece. Make allowances for saturation of roller covers <strong>and</strong> application<br />

equipment. Allow 2 hours cure time prior to exposing the membrane to foot traffic.<br />

3.08 WALKTREAD/SKID RESISTANT SURFACING FOR RESIN ROOF SURFACES<br />

A. Granule Anti-Skid Application: Utilize masking tape to outline the areas to receive the<br />

anti-skid system. Apply an additional top coat of the catalyzed roof resin at the minimum<br />

rate specified by the resin manufacturer; <strong>and</strong> broadcast granules before the resin sets.<br />

Remove tape before the resin sets. Apply a coat of resin over the granule surface if<br />

required by the roofing system manufacturer.<br />

3.09 RELATED COMPONENTS - INSTALLATION<br />

A. Edge Metal: Completely prime metal flanges <strong>and</strong> allow to dry prior to installation. Turn the<br />

base ply down 2 inches past the roof edge <strong>and</strong> over the nailer. After the base ply <strong>and</strong><br />

continuous cleat (if applicable) have been installed, set the flange in mastic <strong>and</strong> stagger nail<br />

every 3 inches on center. Strip-in the flange using the stripping-ply material, extending a<br />

minimum of 4 inches beyond the edge of the flange. Terminate the finish ply at the gravelstop<br />

rise of the edge metal. SEE ITEM: SEALANT, for finish of this detail.<br />

B. Metal Coping: Metal coping shall be fabricated with a minimum four (4) inch face on each<br />

side. The cap metal shall be of sufficient width to adequately cover the top of the parapet<br />

wall. The bottom edge of each fascia shall have a minimum one-half (1/2) inch drip edge,<br />

hemmed <strong>and</strong> formed at thirty (30) degrees <strong>and</strong> shall be fabricated for attachment to a<br />

continous cleat at each side of the parapet. Metal coping shall be fabricated in maximum<br />

ten (10) feet sections. Fabricate corner pieces of metal coping to extend a minimum of one<br />

M-13-135 page - 20 <strong>Citrus</strong> <strong>Library</strong> <strong>Roofing</strong> Specification

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!