District: CITRUS COMMUNITY COLLEGE DISTRICT GUARANTEE Project Name: <strong>Bid</strong> <strong>#01</strong>-<strong>1112</strong>, <strong>Library</strong> <strong>and</strong> <strong>Reprographics</strong> <strong>Roofing</strong> Project Contractor Name: _____________________________ The Contractor hereby warrants <strong>and</strong> guarantees to the District that all work, materials, equipment <strong>and</strong> workmanship provided, furnished or installed by or on behalf of Contractor in connection with the above-referenced Project ("Work") have been provided, furnished <strong>and</strong> installed in strict conformity with the Contract Documents for the Work, including without limitation, the Drawings <strong>and</strong> the Specifications. Contractor further warrants <strong>and</strong> guarantees that all work, materials, equipment <strong>and</strong> workmanship as provided, furnished <strong>and</strong>/or installed are fit for use as specified <strong>and</strong> fulfill all applicable requirements of the Contract Documents including without limitation, the Drawings <strong>and</strong> the Specifications. Contractor shall, at its sole cost <strong>and</strong> expense, repair, correct <strong>and</strong>/or replace any or all of the work, materials, equipment <strong>and</strong>/or workmanship of the Work, together with any other items which may be affected by any such repairs, corrections or replacement, that may be unfit for use as specified or defective within a period of one (1) year from the date of the District's Final Acceptance of the Work, ordinary wear <strong>and</strong> tear <strong>and</strong> unusual abuse or neglect excepted. In the event of the Contractor's failure <strong>and</strong>/or refusal to comply with the provisions of this Guarantee, within the period of time set forth in the Contract Documents after the District's issuance of the Notice to the Contractor of any defect(s) in the Work, materials, equipment or workmanship, Contractor authorizes the District, without further notice to Contractor, to repair, correct <strong>and</strong>/or replace any such defective item at the expense of the Contractor. The Contractor shall reimburse the District for all costs, expenses or fees incurred by the District in providing or performing such repairs, corrections or replacements within ten (10) days of the District's presentation of a dem<strong>and</strong> to the Contractor for the same. The provisions of this Guarantee <strong>and</strong> the provisions of the Contract Documents for the Work relating to the Contractor's Guarantee(s) <strong>and</strong> warranty(ies) relating to the Work shall be binding upon the Contractor's Performance Bond Surety <strong>and</strong> all successors or assigns of Contractor <strong>and</strong>/or Contractor's Performance Bond Surety. The provisions of this Guarantee are in addition to, <strong>and</strong> not in lieu of, any provisions of the Contract Documents for the Work relating to the Contractor's guarantee(s) <strong>and</strong> warranty(ies) or any guarantee(s) or warranty(ies) provided by any material supplier or manufacturer of any equipment, materials or other items forming a part of, or incorporated into the Work, or any other guarantee or warranty obligation of the Contractor, prescribed, implied or imposed by law. <strong>Citrus</strong> Community <strong>College</strong> District <strong>Bid</strong> Due Date: November 15, 2011 at 3:00: p.m. <strong>Bid</strong> <strong>#01</strong>-<strong>1112</strong> <strong>Library</strong> <strong>and</strong> <strong>Reprographics</strong> <strong>Roofing</strong> Project Page 34 of 96
The undersigned individual executing this Guarantee on behalf of Contractor warrants <strong>and</strong> represents that he/she is duly authorized to execute this Guarantee on behalf of Contractor <strong>and</strong> to bind Contractor to each <strong>and</strong> every provision hereof. Dated: _______ By: ___________________ (Signature) ___ _______________________________________ (Typewritten or h<strong>and</strong>written name) _________________________________________ (Title) <strong>Citrus</strong> Community <strong>College</strong> District <strong>Bid</strong> Due Date: November 15, 2011 at 3:00: p.m. <strong>Bid</strong> <strong>#01</strong>-<strong>1112</strong> <strong>Library</strong> <strong>and</strong> <strong>Reprographics</strong> <strong>Roofing</strong> Project Page 35 of 96
- Page 1 and 2: Bid #01-1112 Library and Reprograph
- Page 3 and 4: NOTICE TO CONTRACTORS CALLING FOR B
- Page 5 and 6: Preparation and Submittal of Bid Pr
- Page 7 and 8: District's Right to Modify Contract
- Page 9 and 10: Job-Walk Proposals must be held ope
- Page 11 and 12: documents submitted in response to
- Page 13 and 14: Purchasing Office located at 1000 W
- Page 15 and 16: acknowledges that the District may,
- Page 17 and 18: SUBCONTRACTORS LIST Bidder: _______
- Page 19 and 20: ___________________________________
- Page 21 and 22: 5.1.2 Are there any judgments, orde
- Page 23 and 24: Executed this ________ day of _____
- Page 25 and 26: IN WITNESS WHEREOF, the Principal a
- Page 27 and 28: AGREEMENT THIS AGREEMENT is made th
- Page 29 and 30: LABOR AND MATERIAL PAYMENT BOND KNO
- Page 31 and 32: PERFORMANCE BOND KNOW ALL MEN BY TH
- Page 33 and 34: CERTIFICATE OF WORKERS' COMPENSATIO
- Page 35: 5. Contractor and I acknowledge tha
- Page 39 and 40: 6.1 Workers' Compensation Insurance
- Page 41 and 42: GENERAL CONDITIONS ARTICLE 1: DEFIN
- Page 43 and 44: equipment or workmanship forming a
- Page 45 and 46: 3.1.4 Verification of Applications
- Page 47 and 48: actual or potential impact of any s
- Page 49 and 50: coordination of the Work and compon
- Page 51 and 52: superintendent shall represent the
- Page 53 and 54: Contract Time or the Contract Price
- Page 55 and 56: 4.10 Safety limitation, orders for
- Page 57 and 58: 4.11.5 Compliance with Proposition
- Page 59 and 60: 4.21.2 Payment of Prevailing Rates.
- Page 61 and 62: eight (8) hours in any calendar day
- Page 63 and 64: that such person hold a valid contr
- Page 65 and 66: performed, whether such operations
- Page 67 and 68: 6.8 Indemnity. Unless arising solel
- Page 69 and 70: 7.3.1 Submittal of Preliminary Cons
- Page 71 and 72: hereinabove. The District's electio
- Page 73 and 74: or Final Completion, the Work is ac
- Page 75 and 76: Payment pursuant to the preceding s
- Page 77 and 78: following, the submittal of which a
- Page 79 and 80: (xxi) Failure to properly pay preva
- Page 81 and 82: failure, for any reason, to give wr
- Page 83 and 84: shall constitute full compensation
- Page 85 and 86: with the performance of such item o
- Page 87 and 88:
tests, inspections or approvals rev
- Page 89 and 90:
of the Contractor under the Contrac
- Page 91 and 92:
15.1.7 Conversion to Termination fo
- Page 93 and 94:
SPECIAL CONDITIONS 1. Application o
- Page 95 and 96:
REQUEST FOR SUBSTITUTION FORM Failu
- Page 97 and 98:
CERTIFICATION OF EQUAL PERFORMANCE
- Page 99 and 100:
W-9 Form (Rev. October 2007) Depart
- Page 101 and 102:
Form W-9 (Rev. 10-2007) Generally,
- Page 103 and 104:
Citrus College Citrus Community Col
- Page 105 and 106:
Roofing Specification For: Citrus C
- Page 107 and 108:
The basic work descriptions (compon
- Page 109 and 110:
7. Duct systems shall not be pressu
- Page 111 and 112:
1. Letter from the proposed primary
- Page 113 and 114:
3. Limited Access: Prevent access b
- Page 115 and 116:
2. Self-Adhesive Modified Bitumen F
- Page 117 and 118:
1. Insulation Fasteners: Insulation
- Page 119 and 120:
metal edge fascia with 1 foot secti
- Page 121 and 122:
fastening should be provided at all
- Page 123 and 124:
ase ply surface and up the primed w
- Page 125 and 126:
C. Lead Pipe Flashings: Completely
- Page 127 and 128:
Roofing Specification For: Citrus C
- Page 129 and 130:
Library - Lower Roof Area Project T
- Page 131 and 132:
6. All penetrations into ducts shal
- Page 133 and 134:
All submittals which do not conform
- Page 135 and 136:
designated crew member shall watch
- Page 137 and 138:
Paradiene 20 TG P, by Siplast; Irvi
- Page 139 and 140:
1. Insulation Fasteners: Insulation
- Page 141 and 142:
Fabricate metal edge/fascia in maxi
- Page 143 and 144:
ASTM A 792. Steel decks should be s
- Page 145 and 146:
een applied to the top of the cant,
- Page 147 and 148:
(1) foot in either direction from t