equipment or workmanship forming a part of, or to be incorporated into the Work. Product Data are illustrations,<br />

st<strong>and</strong>ard schedules, performance charts, instructions, brochures, diagrams <strong>and</strong> other information furnished by the<br />

Contractor to illustrate materials or equipment for some portion of the Work. Shop Drawings, Samples <strong>and</strong> Product<br />

Data prepared or furnished by the Contractor or any of its Subcontractors or Material Suppliers are collectively<br />

referred to as “Submittals”.<br />

1.19 Site. The Site is the physical area designated in the Contract Documents for Contractor’s performance,<br />

construction <strong>and</strong> installation of the Work.<br />

1.20 Subcontractors; Sub-Subcontractors. A Subcontractor is a person or entity who has a direct contract<br />

with the Contractor to perform a portion of the Work. "Subcontractor" does not include a separate contractor to the<br />

District or subcontractors of any separate contractor. A Sub-Subcontractor is a person or entity of any tier, who has<br />

a direct or indirect contract with a Subcontractor to perform a portion of the Work at the site.<br />

1.21 Special Conditions. If made a part of the Contract Documents, Special Conditions are special or<br />

supplemental provisions, not otherwise provided for in the Agreement or the General Conditions.<br />

1.22 Surety. The Surety is the person or entity that executes, as surety, the Contractor's Labor <strong>and</strong> Material<br />

Payment Bond <strong>and</strong>/or Performance Bond or other bonds provided by the Contractor.<br />

1.23 Work. The "Work" is the construction <strong>and</strong> services required by the Contract Documents, whether<br />

completed or partially completed, <strong>and</strong> includes all other labor, materials, equipment or services provided or to be<br />

provided by the Contractor to fulfill the Contractor's obligations under the Contract Documents. The Work may<br />

constitute the whole or a part of the Project.<br />

ARTICLE 2: DISTRICT<br />

2.1 Information Required of District<br />

2.1.1 Surveys; Site Information. District may provide information concerning physical characteristics of<br />

the Site. Information not provided by the District concerning physical characteristics of the Site, which is<br />

required, shall be obtained by Contractor without adjustment to the Contract Price or the Contract Time.<br />

2.1.2 Drawings <strong>and</strong> Specifications. All of the Drawings <strong>and</strong> the Specifications shall remain the property<br />

of the District; the Contractor shall not use the Drawings or the Specifications in connection with any other<br />

work of improvement other than the Work of the Project.<br />

2.1.3 Furnishing of Information. Information or services to be provided by the District under the<br />

Contract Documents shall be furnished by the District with reasonable promptness to avoid delay in the<br />

orderly progress of the Work. Information about existing conditions furnished by the District under the<br />

Contract Documents is obtained from sources believed to be reliable, but the District neither guarantees<br />

nor warrants that such information is complete <strong>and</strong> accurate. The Contractor shall verify all information<br />

provided by the District. To the extent that the Contract Documents depict existing conditions on or about<br />

the Site, or the Work involves the renovation, removal or remodeling of existing improvements, or the Work<br />

involves any tie-in or other connection with any existing improvements, the conditions <strong>and</strong>/or existing<br />

improvements depicted in the Contract Documents are as they are believed to exist.<br />

2.2 District's Right to Stop the Work. In addition to the District's right to suspend the Work or terminate the<br />

Contract pursuant to the Contract Documents, the District may, by written order, direct the Contractor to stop the<br />

Work, or any portion thereof, until the cause for such stop work order has been eliminated, if the Contractor: (i) fails<br />

to correct Work which is not in conformity <strong>and</strong> in accordance with the requirements of the Contract Documents, or<br />

(ii) otherwise fails to carry out the Work in conformity <strong>and</strong> accordance with the Contract Documents. The right of the<br />

District to stop the Work hereunder shall not be deemed a duty on the part of the District to exercise such right for<br />

the benefit of the Contractor or any other person or entity, nor shall the District's exercise of such right waive or limit<br />

the exercise of any other right or remedy of the District under the Contract Documents or at law.<br />

<strong>Citrus</strong> Community <strong>College</strong> District <strong>Bid</strong> Due Date: November 15, 2011 at 3:00: p.m.<br />

<strong>Bid</strong> <strong>#01</strong>-<strong>1112</strong> <strong>Library</strong> <strong>and</strong> <strong>Reprographics</strong> <strong>Roofing</strong> Project Page 41 of 96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!