4.15 Cutting <strong>and</strong> Patching. The Contractor shall be responsible for cutting, fitting or patching required to<br />

complete the Work or to make the component parts thereof fit together properly in accordance with the Contract<br />

Documents. Only tradespersons skilled <strong>and</strong> experienced in cutting <strong>and</strong> patching shall perform such work. The<br />

Contractor shall not damage or endanger any portion of the Work, or the fully or partially completed construction of<br />

the District or separate contractors by cutting, patching, excavation or other alteration. The Contractor shall not cut,<br />

patch or otherwise alter the construction by the District or separate contractor without the prior written consent of<br />

the District or separate contractor thereto, which consent shall not be unreasonably withheld. The Contractor shall<br />

not unreasonably withhold consent to the request of the District or separate contractor to cut, patch or otherwise<br />

alter the Work.<br />

4.16 Clean-Up. The Contractor shall at all times keep the Site <strong>and</strong> all adjoining areas free from the accumulation<br />

of any waste material, rubbish or excess materials <strong>and</strong> equipment, placed, caused by performance of the Work.<br />

This shall include cleaning all wall cavities <strong>and</strong> dead spaces prior to installing wallboard. The Contractor shall<br />

maintain the Site in a "rake-clean" st<strong>and</strong>ard on a daily basis. Prior to completion of the Work, Contractor shall<br />

remove from the Site all rubbish, waste <strong>and</strong> excess material, tools, Construction Equipment, machinery, temporary<br />

facilities <strong>and</strong> barricades, <strong>and</strong> any other items which are not the property of the District under the Contract<br />

Documents. Upon completion of the Work, the Site <strong>and</strong> all adjoining areas shall be left in a neat <strong>and</strong> broom clean<br />

condition satisfactory to District. The Project Manager is authorized to direct the Contractor's clean-up obligations<br />

hereunder. If the Contractor fails to clean up as provided for in the Contract Documents, the District may do so, <strong>and</strong><br />

all costs incurred in connection therewith shall be charged to the Contractor; the District may deduct such costs<br />

from any portion of the Contract Price then or thereafter due the Contractor.<br />

4.17 Access to the Work. The Contractor shall provide the DSA, the District, the Project Manager, the District's<br />

Inspector, the Architect <strong>and</strong> the Architect's consultant(s) with access to the Work, whether in place, preparation <strong>and</strong><br />

progress <strong>and</strong> wherever located.<br />

4.18 Information for the District's Inspector. The Contractor shall furnish the District's Inspector access to the<br />

Work for obtaining such information as may be necessary to keep the District's Inspector fully informed respecting<br />

the progress, quality <strong>and</strong> character of the Work <strong>and</strong> materials, equipment or other items incorporated therein.<br />

4.19 Facilities for District’s Inspector’s. The Contractor shall provide, at no additional cost or expense to the<br />

District, for use by the District, the Project Manager <strong>and</strong> the District’s Inspector, at the Site, a temporary trailer<br />

meeting or exceeding the requirements set forth in the Specifications, along with the items of furniture, furnishings<br />

<strong>and</strong> office equipment identified in the Specifications. The Contractor shall provide <strong>and</strong> pay for all costs, including<br />

without limitation, utility <strong>and</strong> telephone services associated with the use of such temporary trailer, until removal of<br />

the same is authorized by the District. The costs for providing of all such items pursuant to the foregoing shall be<br />

included within the Contract Price.<br />

4.20 Patents <strong>and</strong> Royalties. The Contractor <strong>and</strong> the Surety shall defend, indemnify <strong>and</strong> hold harmless the<br />

District <strong>and</strong> its agents, employees <strong>and</strong> officers from any claim, dem<strong>and</strong> or legal proceeding arising out of or<br />

pertaining, in any manner, to any actual or claimed infringement of patent rights in connection with performance of<br />

the Work under the Contract Documents.<br />

4.21 Prevailing Wage Rates; Employment of Labor<br />

4.21.1 Determination of Prevailing Rates. Pursuant to the provisions of Division 2, Part 7, Chapter 1,<br />

Article 2 of the California Labor Code at §§1770 et seq., the District has obtained from the Director of the<br />

Department of Industrial Relations the general prevailing rate of per diem wages <strong>and</strong> the prevailing rate for<br />

holiday <strong>and</strong> overtime work in the locality in which the Work is to be performed. These rates are on file at<br />

the District’s principal office. The Contractor shall post, at appropriate <strong>and</strong> conspicuous locations on the<br />

Site, a schedule showing all determined general prevailing wage rates.<br />

<strong>Citrus</strong> Community <strong>College</strong> District <strong>Bid</strong> Due Date: November 15, 2011 at 3:00: p.m.<br />

<strong>Bid</strong> <strong>#01</strong>-<strong>1112</strong> <strong>Library</strong> <strong>and</strong> <strong>Reprographics</strong> <strong>Roofing</strong> Project Page 56 of 96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!