- Page 1 and 2: Bid #01-1112 Library and Reprograph
- Page 3 and 4: NOTICE TO CONTRACTORS CALLING FOR B
- Page 5 and 6: Preparation and Submittal of Bid Pr
- Page 7 and 8: District's Right to Modify Contract
- Page 9 and 10: Job-Walk Proposals must be held ope
- Page 11 and 12: documents submitted in response to
- Page 13 and 14: Purchasing Office located at 1000 W
- Page 15 and 16: acknowledges that the District may,
- Page 17 and 18: SUBCONTRACTORS LIST Bidder: _______
- Page 19 and 20: ___________________________________
- Page 21: 5.1.2 Are there any judgments, orde
- Page 25 and 26: IN WITNESS WHEREOF, the Principal a
- Page 27 and 28: AGREEMENT THIS AGREEMENT is made th
- Page 29 and 30: LABOR AND MATERIAL PAYMENT BOND KNO
- Page 31 and 32: PERFORMANCE BOND KNOW ALL MEN BY TH
- Page 33 and 34: CERTIFICATE OF WORKERS' COMPENSATIO
- Page 35 and 36: 5. Contractor and I acknowledge tha
- Page 37 and 38: The undersigned individual executin
- Page 39 and 40: 6.1 Workers' Compensation Insurance
- Page 41 and 42: GENERAL CONDITIONS ARTICLE 1: DEFIN
- Page 43 and 44: equipment or workmanship forming a
- Page 45 and 46: 3.1.4 Verification of Applications
- Page 47 and 48: actual or potential impact of any s
- Page 49 and 50: coordination of the Work and compon
- Page 51 and 52: superintendent shall represent the
- Page 53 and 54: Contract Time or the Contract Price
- Page 55 and 56: 4.10 Safety limitation, orders for
- Page 57 and 58: 4.11.5 Compliance with Proposition
- Page 59 and 60: 4.21.2 Payment of Prevailing Rates.
- Page 61 and 62: eight (8) hours in any calendar day
- Page 63 and 64: that such person hold a valid contr
- Page 65 and 66: performed, whether such operations
- Page 67 and 68: 6.8 Indemnity. Unless arising solel
- Page 69 and 70: 7.3.1 Submittal of Preliminary Cons
- Page 71 and 72: hereinabove. The District's electio
- Page 73 and 74:
or Final Completion, the Work is ac
- Page 75 and 76:
Payment pursuant to the preceding s
- Page 77 and 78:
following, the submittal of which a
- Page 79 and 80:
(xxi) Failure to properly pay preva
- Page 81 and 82:
failure, for any reason, to give wr
- Page 83 and 84:
shall constitute full compensation
- Page 85 and 86:
with the performance of such item o
- Page 87 and 88:
tests, inspections or approvals rev
- Page 89 and 90:
of the Contractor under the Contrac
- Page 91 and 92:
15.1.7 Conversion to Termination fo
- Page 93 and 94:
SPECIAL CONDITIONS 1. Application o
- Page 95 and 96:
REQUEST FOR SUBSTITUTION FORM Failu
- Page 97 and 98:
CERTIFICATION OF EQUAL PERFORMANCE
- Page 99 and 100:
W-9 Form (Rev. October 2007) Depart
- Page 101 and 102:
Form W-9 (Rev. 10-2007) Generally,
- Page 103 and 104:
Citrus College Citrus Community Col
- Page 105 and 106:
Roofing Specification For: Citrus C
- Page 107 and 108:
The basic work descriptions (compon
- Page 109 and 110:
7. Duct systems shall not be pressu
- Page 111 and 112:
1. Letter from the proposed primary
- Page 113 and 114:
3. Limited Access: Prevent access b
- Page 115 and 116:
2. Self-Adhesive Modified Bitumen F
- Page 117 and 118:
1. Insulation Fasteners: Insulation
- Page 119 and 120:
metal edge fascia with 1 foot secti
- Page 121 and 122:
fastening should be provided at all
- Page 123 and 124:
ase ply surface and up the primed w
- Page 125 and 126:
C. Lead Pipe Flashings: Completely
- Page 127 and 128:
Roofing Specification For: Citrus C
- Page 129 and 130:
Library - Lower Roof Area Project T
- Page 131 and 132:
6. All penetrations into ducts shal
- Page 133 and 134:
All submittals which do not conform
- Page 135 and 136:
designated crew member shall watch
- Page 137 and 138:
Paradiene 20 TG P, by Siplast; Irvi
- Page 139 and 140:
1. Insulation Fasteners: Insulation
- Page 141 and 142:
Fabricate metal edge/fascia in maxi
- Page 143 and 144:
ASTM A 792. Steel decks should be s
- Page 145 and 146:
een applied to the top of the cant,
- Page 147 and 148:
(1) foot in either direction from t