coordination of the Work <strong>and</strong> component parts thereof so that Substantial Completion of the Work will be<br />

achieved within the Contract Time <strong>and</strong> the Work will be completed for the Contract Price. The coordination<br />

of the Work is a material obligation of the Contractor hereunder <strong>and</strong> shall include without limitation,<br />

conducting regular coordination meetings with its Subcontractors <strong>and</strong> Material Suppliers, sequencing the<br />

operations of Subcontractors <strong>and</strong> Material Suppliers, <strong>and</strong> adapting its planned means, methods <strong>and</strong><br />

sequences of construction operations as necessary to accommodate field or changed conditions at the<br />

Site. These meetings are to be held at minimum once each month. Meeting notes shall be forwarded to the<br />

District Project Manager within seven days of each meeting. District Project Manager <strong>and</strong> Project Inspector<br />

will attend the coordination meetings.<br />

4.4.3 Surveys. The Contractor shall prepare or cause to be prepared all detailed surveys necessary for<br />

performance of the Work. The Contractor shall be responsible for the establishment, location, maintenance<br />

<strong>and</strong> preservation of benchmarks, reference points <strong>and</strong> stakes for the Work, the cost of which shall be<br />

included within the Contract Price. The Contractor shall be solely responsible for all loss or costs resulting<br />

from the loss, destruction, disturbance or damage of benchmarks, reference points or stakes.<br />

4.4.4 Construction Utilities. The Contractor shall arrange for the furnishing of <strong>and</strong> shall pay the costs of<br />

all utility services, including, without limitation, electricity, water, gas <strong>and</strong> telephone necessary for<br />

performance of the Work <strong>and</strong> the Contractor's obligations under the Contract Documents. The Contractor<br />

shall furnish <strong>and</strong> install necessary or appropriate temporary distributions of utilities, including meters, to the<br />

Site. Any such temporary distributions shall be removed by the Contractor upon completion of the Work.<br />

The costs of all such utility services, including the installation <strong>and</strong> removal of temporary distributions<br />

thereof, shall be borne by the Contractor <strong>and</strong> included in the Contract Price.<br />

4.4.5 Existing Utilities; Removal, Relocation <strong>and</strong> Protection. In accordance with California<br />

Government Code §4215, the District shall assume the responsibility for the timely removal, relocation, or<br />

protection of existing main or trunkline utility facilities located on the Site which are not identified in the<br />

Drawings, Specifications or other Contract Documents. Contractor shall be compensated for the costs of<br />

locating, repairing damage not due to the Contractor's failure to exercise reasonable care, <strong>and</strong> removing or<br />

relocating such utility facilities not indicated in the Drawings, Specifications <strong>and</strong> other Contract Documents<br />

with reasonable accuracy, <strong>and</strong> for equipment on the Site necessarily idled during such work. Contractor<br />

shall not be assessed Liquidated Damages for delay in completion of the Work when such delay is caused<br />

by the failure of the District or the utility district to provide for removal or relocation of such utility facilities.<br />

Nothing in this Article 4.4.5 shall be deemed to require the District to indicate the presence of existing<br />

service laterals or appurtenances whenever the presence of such utilities on the Site can be inferred from<br />

the presence of other visible facilities, such as buildings, meters <strong>and</strong> junction boxes, on or adjacent to the<br />

Site. If the Contractor encounters utility facilities not identified by the District in the Drawings,<br />

Specifications, or other Contract Documents, the Contractor shall immediately notify, in writing, the District<br />

<strong>and</strong> the utility owner. In the event that such utility facilities are owned by a public utility, the public utility<br />

shall have the sole discretion to perform repairs or relocation work or permit the Contractor to do such<br />

repairs or relocation work at a price determined in accordance with Article 9 of these General Conditions.<br />

4.4.6 Conferences <strong>and</strong> Meetings A material obligation of the Contractor under the Contract Documents<br />

is the attendance by the Contractor's supervisory personnel for the Work <strong>and</strong> the Contractor's management<br />

personnel as required by the Contract Documents or as requested by the District. The Contractor's<br />

personnel participating in conferences <strong>and</strong> meetings relating to the Work shall be authorized to act on<br />

behalf of the Contractor <strong>and</strong> to bind the Contractor. The Contractor is solely responsible for arranging for<br />

the attendance by Subcontractors, Material Suppliers at meetings <strong>and</strong> conferences relating to the Work as<br />

necessary, appropriate or as requested by the District.<br />

<strong>Citrus</strong> Community <strong>College</strong> District <strong>Bid</strong> Due Date: November 15, 2011 at 3:00: p.m.<br />

<strong>Bid</strong> <strong>#01</strong>-<strong>1112</strong> <strong>Library</strong> <strong>and</strong> <strong>Reprographics</strong> <strong>Roofing</strong> Project Page 47 of 96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!