04.08.2013 Views

Guidelines for determination of tariff & SBD for ... - Ministry of Power

Guidelines for determination of tariff & SBD for ... - Ministry of Power

Guidelines for determination of tariff & SBD for ... - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.<br />

5.<br />

6.<br />

….<br />

Standard RFP <strong>for</strong> ….[Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case - 1<br />

Notes:<br />

1. Status <strong>of</strong> equity holding should be provided not earlier than 30 (thirty) days prior to<br />

Bid Deadline.<br />

2. The above table is to be filled in separately <strong>for</strong> each Consortium Member if<br />

applicable.<br />

Documents submitted in support <strong>of</strong> establishing the relationship with the Parent<br />

Company / Affiliate with the Bidding Company or with the Member <strong>of</strong> the Bidding<br />

Consortium (including Lead Member) in terms <strong>of</strong> the provisions <strong>of</strong> Clause 2.1.5 <strong>of</strong><br />

this RFP:<br />

1. ………………………<br />

2. ……………………….<br />

3. ………………………..<br />

4. …………………………<br />

Date:…………………….<br />

Place: ……………………………….<br />

For and on behalf <strong>of</strong> Bidding Company/ Member <strong>of</strong> the Consortium<br />

M/s………………………………………………….<br />

……………………………………………<br />

(Signature <strong>of</strong> authorized representative<br />

Name:…………………………….<br />

Designation:…………………………….<br />

Stamp:…………………………….<br />

………..[Insert name <strong>of</strong> Procurer / Authorized Representative ] Page 78

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!