Standard PPA <strong>for</strong> … [Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case -1<br />

c) the Aggregate Contracted Capacity <strong>of</strong> the Procurer(s) shall be reduced<br />

proportionately, and the Availability Factor shall be calculated by reference to the<br />

reduced Aggregate Contracted Capacity, in each case with effect from date on which<br />

[Insert “the Procurer” in case <strong>of</strong> single Procurer or “all the Procurer(s) jointly” in<br />

case <strong>of</strong> multiple Procurers] first requested the Control Centre to assess the <strong>Power</strong><br />

Station’s Net Capacity.<br />

d) [Insert only in case when Seller is not a Trading Licensee]the Capital Cost and each<br />

element <strong>of</strong> the Capital Structure Schedule shall be reduced in proportion to the<br />

reduction in the Aggregate Contracted Capacity as a result <strong>of</strong> that derating.<br />

5.6.2 If at the end <strong>of</strong> subsequent demonstration <strong>of</strong> the <strong>Power</strong> Station’s Net Capacity by the<br />

Seller at the end <strong>of</strong> the six Month period referred to in Article 5.5.2, the Assessed<br />

Capacity comes out to be still less than the sum total <strong>of</strong> all contracted capacities <strong>of</strong> the<br />

<strong>Power</strong> Station having duration <strong>of</strong> contracts in excess <strong>of</strong> one year, the consequences<br />

mentioned in Article 5.6.1 shall apply on such Assessed Capacity <strong>for</strong> a period <strong>of</strong> at least<br />

one year from such date <strong>of</strong> demonstration <strong>of</strong> the <strong>Power</strong> Station’s Net Capacity after<br />

which the Seller shall once again have the right to demonstrate the <strong>Power</strong> Station’s Net<br />

Capacity. The consequences mentioned in Article 5.6.1 shall be modified based on the<br />

most recent Assessed Capacity <strong>of</strong> the <strong>Power</strong> Station.<br />

5.6.3 If the Control Centre is unable to assess the <strong>Power</strong> Station’s Net Capacity because <strong>of</strong><br />

events or circumstances beyond the ………………………… [Insert “Seller’s” if Seller<br />

is NOT a Trading Licensee, or “Developer’s” if Seller is a Trading Licensee] reasonable<br />

control, the Control Centre shall reschedule an assessment as soon as reasonably<br />

practicable.<br />

…….[Insert name <strong>of</strong> Procurer(s)] 42