Standard PPA <strong>for</strong> … [Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case -1<br />
“Non-Natural Force<br />
Majeure Event”<br />
“Normative<br />
Availability”<br />
“Notice to Proceed” or<br />
“NTP”<br />
[to be inserted only in<br />
case <strong>of</strong> long term<br />
procurement]<br />
shall have the meaning ascribed thereto in Article 9.3 <strong>of</strong> this<br />
Agreement;<br />
shall mean …………. percent (……….%) 7 [Insert in both words and<br />
figures respectively, in line with Clause 4.4 <strong>of</strong> the Bidding<br />
<strong>Guidelines</strong>] Availability <strong>of</strong> the Aggregate Contracted Capacity at the<br />
Interconnection Point on Contract Year basis.<br />
shall mean the date on which the [Insert “Seller” if Seller is NOT a<br />
Trading Licensee, or “Developer” if Seller is a Trading Licensee]<br />
shall fulfill the conditions as contained in Article 3.1.1 <strong>of</strong> this<br />
Agreement in accordance with the provisions <strong>of</strong> this Agreement;<br />
"Operating Period"; shall mean the period commencing from the Delivery Date, until the<br />
Expiry Date or date <strong>of</strong> earlier termination <strong>of</strong> this Agreement in<br />
accordance with Article 2 <strong>of</strong> this Agreement;<br />
“Parent Company” or<br />
“Parent”<br />
shall mean a company that holds at least twenty six percent (26%) <strong>of</strong><br />
the paid-up equity capital directly or indirectly in the Seller or in the<br />
Member, as the case may be;<br />
"Party" and "Parties" shall have the meaning ascribed thereto in the recital to this<br />
Agreement;<br />
“Payment Mechanism” shall have the meaning ascribed thereto in Article 8.4 <strong>of</strong> this<br />
Agreement;<br />
“<strong>Power</strong> Station”<br />
“<strong>Power</strong> Station’s Net<br />
Capacity”<br />
shall mean the …. [Insert name <strong>of</strong> generation source specified by the<br />
Successful Bidder in its Bid] power generation facility <strong>of</strong> installed<br />
capacity <strong>of</strong> ………..[Insert capacity ] MW, located at …………….<br />
[Insert name <strong>of</strong> the place] in …. [Insert name <strong>of</strong> the District and<br />
State];<br />
This includes all units and auxiliaries such as associated Fuel<br />
handling, treatment or storage facilities; water supply, treatment or<br />
storage facilities; the ash disposal system including ash dyke [if<br />
applicable]; bay/s <strong>for</strong> transmission system in the switchyard, dam,<br />
intake, water conductor system [if applicable] , and all the other<br />
assets, buildings/structures, equipments, plant and machinery,<br />
facilities and related assets required <strong>for</strong> the efficient and economic<br />
operation <strong>of</strong> the power generation facility;<br />
whether completed or at any stage <strong>of</strong> development and construction<br />
or intended to be developed and constructed <strong>for</strong> the purpose <strong>of</strong><br />
supply <strong>of</strong> power as per this Agreement;<br />
shall mean [………] MW, being Installed Capacity <strong>of</strong> the <strong>Power</strong><br />
Station measured at the bus-bar, reduced by the normative auxiliary<br />
power consumption as prescribed by CERC from time to time;<br />
7 This shall be aligned to the level specified in the <strong>tariff</strong> regulations <strong>of</strong> the Central Electricity Regulatory<br />