04.08.2013 Views

Guidelines for determination of tariff & SBD for ... - Ministry of Power

Guidelines for determination of tariff & SBD for ... - Ministry of Power

Guidelines for determination of tariff & SBD for ... - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

………..[Insert name <strong>of</strong> Procurer / Authorized Representative ] Page 105<br />

Standard RFP <strong>for</strong> ….[Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case - 1<br />

a) The Bidder may quote <strong>for</strong> any quantum <strong>of</strong> power up to the Requisitioned Capacity <strong>for</strong> the full contract period but not less than the Minimum<br />

Bid Capacity.<br />

b) The Bidder may submit options <strong>for</strong> fractional capacity (<strong>of</strong>fered part quantum) which it is willing to supply at the same quoted <strong>tariff</strong>. The<br />

number <strong>of</strong> options <strong>for</strong> fractional capacity is left to the discretion <strong>of</strong> the Bidder.<br />

c) The Quoted Tariff in Rs./kWh shall be provided up to three (3) decimal points and upto five (5) decimal points in case <strong>of</strong> Quoted Tariff in<br />

USD.<br />

d) All pages <strong>of</strong> this Format shall be signed by the authorized signatory in whose name <strong>Power</strong> <strong>of</strong> Attorney as per Clause 2.4.1.1 is issued.<br />

e) Ensure ….. [Insert no. <strong>of</strong> years depending upon the term <strong>of</strong> PPA] values <strong>of</strong> Non Escalable <strong>tariff</strong> components and only 1 value <strong>for</strong> Escalable<br />

components.<br />

f) The Bidder shall not be allowed to submit different Quoted Tariffs <strong>for</strong> power proposed to be supplied from the same generation source. The<br />

Bidder shall submit different Financial Bids <strong>for</strong> power proposed to be supplied from different generation sources,<br />

g) The contents <strong>of</strong> this <strong>for</strong>mat shall be clearly typed.<br />

h) In case <strong>of</strong> a hydel generation source, the Bidder shall fill in only the Columns 4, 5 and 6 <strong>of</strong> this Format. The Escalable Energy Charges shall<br />

not be applicable <strong>for</strong> evaluation or payment in such case.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!