Standard PPA <strong>for</strong> … [Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case -1<br />
an irrevocable NTP and the Seller shall have submitted a letter to this effect to the<br />
Procurer(s);”]<br />
[Insert this condition <strong>for</strong> existing plants] The Seller shall submit evidence <strong>of</strong><br />
commissioning <strong>of</strong> the <strong>Power</strong> Station, including details <strong>of</strong> the Installed Capacity;<br />
f) The Seller shall have obtained all Consents, Clearances and Permits required <strong>for</strong><br />
supply <strong>of</strong> power to the Procurer(s) as per the terms <strong>of</strong> this Agreement. In case a<br />
Project Company is incorporated and the Consents, Clearances and Permits have been<br />
obtained in the name <strong>of</strong> a company other than the Project Company, all such<br />
Consents, Clearances and Permits shall have been transferred in the name <strong>of</strong> such<br />
Project Company;<br />
g) The Seller shall have sent a written notice to all the Procurer(s) indicating the<br />
Aggregate Contracted Capacity and total Installed Capacity <strong>for</strong> each unit and <strong>for</strong> the<br />
<strong>Power</strong> Station as a whole expressed in MW;<br />
h) [Insert this condition <strong>for</strong> new plants] [Insert the following if Seller is NOT a Trading<br />
Licensee, “The Seller shall have achieved Financial Closure and has provided a<br />
certificate from the lead banker to this effect;” or insert the following if Seller is a<br />
Trading Licensee, “The Seller shall ensure that the Developer shall have achieved<br />
Financial Closure and has provided a certificate from the lead banker to this effect;”]<br />
i) [To be included if the Seller opts <strong>for</strong> substitution rights <strong>of</strong> the Lender(s)] The Seller<br />
shall have provided an irrevocable letter to the Lenders duly accepting and<br />
acknowledging the rights provided to the Lenders under the terms <strong>of</strong> this Agreement<br />
and all other RFP Documents;<br />
[The following Article to be inserted only in case <strong>of</strong> medium term procurement] The<br />
Seller agrees and undertakes to duly per<strong>for</strong>m and complete the following activities at the<br />
Seller’s own cost and risk within ………………… (…………) Months [Insert number <strong>of</strong><br />
months, as applicable] from the Effective Date, unless such completion is affected by<br />
any Force Majeure event or due to the Procurers’ failure to comply with their obligations<br />
under Article 3.2.1 <strong>of</strong> this Agreement, or if any <strong>of</strong> the activities is specifically waived in<br />
writing by the ………………. [Insert “Procurer” in case <strong>of</strong> single Procurer or<br />
“Procurer(s) jointly” in case <strong>of</strong> multiple Procurers]:<br />
a. The ……………………. [Insert “Seller shall have executed the Fuel Supply<br />
Agreement and have provided a copy <strong>of</strong> the same to the Procurer(s)” if Seller is NOT<br />
a Trading Licensee, or insert “Seller shall ensure that Developer has executed the<br />
Fuel Supply Agreement and further ensure that a copy <strong>of</strong> the same is provided to the<br />
Procurer(s)” if Seller is a Trading Licensee]; [this condition shall not be included in<br />
case the generation source, chosen by the Seller is a captive coal-mine based thermal<br />
plant or a hydro-electric plant];<br />
b. The Seller shall have obtained all the necessary permission <strong>for</strong> the medium term open<br />
access <strong>for</strong> the intrastate transmission system from the <strong>Power</strong> Station bus bar to the<br />
…….[Insert name <strong>of</strong> Procurer(s)] 24