Standard RFP <strong>for</strong> ….[Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case - 1<br />
2.2.4.1 The Bid shall contain a legally en<strong>for</strong>ceable Consortium Agreement entered amongst<br />
the Members in the Bidding Consortium, designating one <strong>of</strong> the Members to be the<br />
Lead Member (as per Format 4.3). There shall be only one Lead Member which<br />
shall continue to hold fifty one percent (51%) equity in the Project Company up to a<br />
period <strong>of</strong> two (2) years after commencement <strong>of</strong> supply <strong>of</strong> power and twenty six<br />
(26%) <strong>for</strong> a period <strong>of</strong> three (3) years thereafter as per provisions <strong>of</strong> Clause 2.7 <strong>of</strong><br />
this RFP and Article 13.2 <strong>of</strong> the PPA. Each Member <strong>of</strong> the Bidding Consortium<br />
shall duly sign the Consortium Agreement making it liable <strong>for</strong> raising the required<br />
funds <strong>for</strong> its respective equity investment commitment as specified in the<br />
Consortium Agreement. In the absence <strong>of</strong> a duly executed Consortium Agreement,<br />
the Bid will not be considered <strong>for</strong> evaluation and will be rejected.<br />
Provided however that the Lead Member <strong>of</strong> the Bidding Consortium shall be liable<br />
to the extent <strong>of</strong> one hundred percent (100%) <strong>of</strong> the total proposed commitment <strong>of</strong><br />
equity investment in the Project Company, i.e., <strong>for</strong> both its own liability as well as<br />
the liability <strong>of</strong> the other Members.<br />
Provided further that the Consortium Agreement shall not be amended without the<br />
prior written approval <strong>of</strong> the Procurer/ Authorized Representative.<br />
2.2.4.2 The Lead Member shall designate one person to represent the Consortium in its<br />
dealings with the Procurer/ Authorized Representative. The person designated by<br />
the Lead Member shall be authorized through a <strong>Power</strong> <strong>of</strong> Attorney (as per Format<br />
4.2 (a)) to per<strong>for</strong>m all tasks including, but not limited to providing in<strong>for</strong>mation,<br />
responding to enquiries, signing <strong>of</strong> Bid on behalf <strong>of</strong> the Consortium, etc.<br />
Additionally, the Bid shall also contain a <strong>Power</strong> <strong>of</strong> Attorney in original (as per<br />
Format 4.2 (b)) in favor <strong>of</strong> the Lead Member issued by the other Members <strong>of</strong> the<br />
Consortium.<br />
2.2.4.3 The Bid shall also contain signed letter <strong>of</strong> consent as per Format 4.4 from each<br />
Member <strong>of</strong> the Consortium confirming that the Bid has been reviewed and each<br />
element <strong>of</strong> the Bid is agreed to by them including but not limited to the investment<br />
commitment in the Project Company.<br />
2.2.4.4 Point <strong>of</strong> contact in case <strong>of</strong> Bidding Consortium<br />
In case <strong>of</strong> Bid being submitted by a Consortium, the Lead Member <strong>of</strong> the<br />
Consortium shall be the single point <strong>of</strong> contact <strong>for</strong> the purposes <strong>of</strong> the Bid process,<br />
be<strong>for</strong>e the date <strong>of</strong> signing <strong>of</strong> last <strong>of</strong> the RFP Documents. Settlement <strong>of</strong> any dispute<br />
amongst the Consortium Members shall not be the responsibility <strong>of</strong> the Procurer/<br />
Authorized Representative and the Procurer/ Authorized Representative shall not<br />
bear any liability whatsoever on this account.<br />
2.2.5 Bid submitted by a Bidding Company<br />
2.2.5.1 The Bidding Company should designate one person to represent the Bidding<br />
Company in its dealings with the Procurer / Authorized Representative. The person<br />
should be authorized to per<strong>for</strong>m all tasks including, but not limited to providing<br />
in<strong>for</strong>mation, responding to enquiries, signing <strong>of</strong> Bid etc. The Bidding Company<br />
should submit, along with Bid, a <strong>Power</strong> <strong>of</strong> Attorney in original (as per Format 4.2<br />
(a)), authorizing the signatory <strong>of</strong> the Bid.<br />
………..[Insert name <strong>of</strong> Procurer / Authorized Representative ] Page 29