04.08.2013 Views

Guidelines for determination of tariff & SBD for ... - Ministry of Power

Guidelines for determination of tariff & SBD for ... - Ministry of Power

Guidelines for determination of tariff & SBD for ... - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Standard RFP <strong>for</strong> ….[Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case - 1<br />

1.3.5 In accordance with Para 3.1 (i) <strong>of</strong> the Bidding <strong>Guidelines</strong>, the Procurer/ Authorized<br />

Representative has already sent an intimation to the Appropriate Commission about the<br />

initiation <strong>of</strong> the bidding process.<br />

[Insert the following if applicable: Further, in case the quantum <strong>of</strong> energy proposed to<br />

be contracted under this bidding process exceeds the projected additional demand<br />

<strong>for</strong>ecast <strong>for</strong> the next three years following the year <strong>of</strong> commencement <strong>of</strong> supply, the<br />

Procurer(s) has already obtained the approval <strong>of</strong> the Appropriate Commission <strong>for</strong> the<br />

quantum <strong>of</strong> power proposed to be procured”].<br />

[Note: Procurer / Authorized Representative shall invite Bids <strong>for</strong> supply <strong>of</strong> power in a<br />

single Bid process <strong>for</strong> any one particular type <strong>of</strong> load requirement, i.e., either base<br />

load or diurnal load or seasonal load requirement and either <strong>for</strong> medium term or <strong>for</strong><br />

long term power procurement.]<br />

………..[Insert name <strong>of</strong> Procurer / Authorized Representative ] Page 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!