Guidelines for determination of tariff & SBD for ... - Ministry of Power
Guidelines for determination of tariff & SBD for ... - Ministry of Power
Guidelines for determination of tariff & SBD for ... - Ministry of Power
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Standard PPA <strong>for</strong> … [Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case -1<br />
and ending on March 31;<br />
Provided that:<br />
(i) in the financial year in which the Scheduled Delivery Date would<br />
occur, the Contract Year shall end on the date immediately<br />
be<strong>for</strong>e the Scheduled Delivery Date and a new Contract Year<br />
shall commence once again from the Scheduled Delivery Date<br />
and end on the immediately succeeding March 31, and thereafter<br />
each period <strong>of</strong> twelve (12) months commencing on April 1 and<br />
ending on March 31, and<br />
(ii) provided further that the last Contract Year <strong>of</strong> this Agreement<br />
shall end on the last day <strong>of</strong> the Term <strong>of</strong> this Agreement;<br />
And further provided that <strong>for</strong> the purpose <strong>of</strong> payment, the Tariff shall<br />
be the Quoted Tariff <strong>for</strong> the applicable Contract Year as per Schedule<br />
8 <strong>of</strong> this Agreement;<br />
"Contracted Capacity" with respect to each Procurer, shall mean the allocation <strong>of</strong> the<br />
Aggregate Contracted Capacity to each <strong>of</strong> the Procurers as provided<br />
in Schedule 1 here<strong>of</strong>, subject to adjustment as per terms <strong>of</strong> this<br />
Agreement; [In case <strong>of</strong> multiple Procurers]<br />
shall mean the Aggregate Contracted Capacity; [In case <strong>of</strong> a single<br />
Procurer]<br />
“Control Centre” shall mean the RLDC and/or SLDC or such other load control centre<br />
designated by the Procurer(s) from time to time through which the<br />
Procurer(s) shall issue Dispatch Instructions to the Seller <strong>for</strong> supply<br />
<strong>of</strong> power;<br />
[Insert this definition in<br />
case Seller is not a<br />
Trading<br />
Licensee]“Debt<br />
Service”<br />
shall mean the amounts which are due under the Financing<br />
Agreements by the Seller to the Lenders, expressed in Rupees (with<br />
all amounts denominated in currencies other than Rupees being<br />
converted to Rupees at the reference exchange rate, which is the<br />
selling rate in Rupees <strong>for</strong> the <strong>for</strong>eign currency on the relevant Day, as<br />
notified by the State Bank <strong>of</strong> India as its TT Rate at 12:00 noon <strong>of</strong><br />
the date <strong>of</strong> Notice to Proceed);<br />
"Declared Capacity" shall mean the <strong>Power</strong> Station’s Net Capacity at the relevant time at<br />
the Interconnection Point (expressed in MW) as declared by the<br />
Seller in accordance with the Grid Code and dispatching procedures<br />
as per the Availability Based Tariff;<br />
“Delivery Date” shall mean the date on which the Seller commences supply <strong>of</strong> the<br />
Aggregate Contracted Capacity to the Procurer(s);<br />
"Delivery Point" shall mean the STU Interface(s) as specified in Schedule 1 <strong>of</strong> this<br />
Agreement;<br />
“Developer”<br />
[Insert this definition in<br />
shall mean the owner <strong>of</strong> the <strong>Power</strong> Station from which the Seller<br />
shall supply the Aggregate Contracted Capacity to the Procurer(s);<br />
…….[Insert name <strong>of</strong> Procurer(s)] 8