Standard RFP <strong>for</strong> ….[Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case - 1<br />
“Quoted Escalable Inland Transportation Charges” shall mean the charges as quoted by<br />
the Bidder in column no. 11 <strong>of</strong> its Financial Bid as per Format 4.10 <strong>of</strong> this RFP (applicable as<br />
per Clause 2.4.1.1(B)(ix) <strong>of</strong> this RFP);<br />
“Quoted Escalable Overseas Transportation Charges” shall mean the charges as quoted by<br />
the Bidder in column no. 13 <strong>of</strong> its Financial Bid as per Format 4.10 <strong>of</strong> this RFP (applicable as<br />
per Clause 2.4.1.1(B)(ix) <strong>of</strong> this RFP);<br />
“Quoted Non Escalable Capacity Charges” shall mean the charges as quoted by the Bidder<br />
in column no. 4 <strong>of</strong> its Financial Bid as per Format 4.10 <strong>of</strong> this RFP;<br />
“Quoted Non Escalable Energy Charges” shall mean the charges as quoted by the Bidder in<br />
column no. 6 or column no. 8 <strong>of</strong> its Financial Bid as per Format 4.10 <strong>of</strong> this RFP(applicable as<br />
per Clause 2.4.1.1(B)(ix) <strong>of</strong> this RFP);<br />
“Quoted Non Escalable Fuel Handling Charges” shall mean the charges as quoted by the<br />
Bidder in column no. 14 <strong>of</strong> its Financial Bid as per Format 4.10 <strong>of</strong> this RFP(applicable as per<br />
Clause 2.4.1.1(B)(ix) <strong>of</strong> this RFP);<br />
“Quoted Non Escalable Inland Transportation Charges” shall mean the charges as quoted<br />
by the Bidder in column no. 10 <strong>of</strong> its Financial Bid as per Format 4.10 <strong>of</strong> this RFP(applicable<br />
as per Clause 2.4.1.1(B)(ix) <strong>of</strong> this RFP);<br />
“Quoted Non Escalable Overseas Transportation Charges” shall mean the charges as<br />
quoted by the Bidder in column no. 12 <strong>of</strong> its Financial Bid as per Format 4.10 <strong>of</strong> this<br />
RFP(applicable as per Clause 2.4.1.1(B)(ix) <strong>of</strong> this RFP);<br />
“Quoted Tariff” shall mean the sum total <strong>of</strong> Quoted Capacity Charges and Quoted Energy<br />
Charges, as applicable, quoted by the Bidder as per the prescribed Format 4.10 and shall be<br />
construed to be at the Interconnection Point as mentioned in its Bid;<br />
“Requisitioned Capacity” means the total aggregate power <strong>of</strong> ……….. [To be inserted by<br />
Procurer/Authorized Representative] MW proposed to be contracted by the Procurer(s) with<br />
the Successful Bidder(s) through this bidding process <strong>for</strong> supply at the Delivery Point <strong>for</strong> the<br />
term <strong>of</strong> the PPA as per the terms and conditions specified therein;<br />
“RFP” shall mean this Request <strong>for</strong> Proposal dated …………… [To be inserted by<br />
Procurer/Authorized Representative] along with all <strong>for</strong>mats and RFP Documents attached<br />
hereto and shall include any modifications, amendments alterations or clarifications thereto;<br />
“RFP Documents” shall mean the following documents to be entered into by the parties to the<br />
respective agreements in connection with the supply <strong>of</strong> power:<br />
a) PPA;<br />
b) Default Escrow Agreement;<br />
c) Agreement to Hypothecate-cum-deed <strong>of</strong> Hypothecation; and<br />
d) any other agreements designated as such, from time to time by the<br />
Procurer/Authorized Representative;<br />