Standard RFP <strong>for</strong> ….[Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case - 1<br />

“Minimum Bid Capacity” shall mean the minimum capacity in MW specified by the<br />

Authorized Representative / Procurer in Clause 1.3.1, <strong>for</strong> which the Bidder is required to<br />

submit its Bid;<br />

“Non Financial Bid” shall mean Envelope I <strong>of</strong> the Bid containing the documents as specified<br />

in Clause 2.4.1.1 <strong>of</strong> the RFP;<br />

“Normative Availability” shall carry the same meaning as defined in the PPA;<br />

“Parent Company” shall mean a company that holds at least twenty six percent (26%) <strong>of</strong> the<br />

paid - up equity capital directly or indirectly in the Bidding Company or in the Member <strong>of</strong> a<br />

Bidding Consortium, as the case may be;<br />

“PPA” 1 shall mean the agreement to be entered into between the Procurer(s) and the Seller<br />

pursuant to which the Seller shall supply power to the Procurer(s) as per the terms and<br />

conditions specified therein and a draft <strong>of</strong> which is attached hereto and marked as Enclosure 1<br />

<strong>of</strong> Format 5.5 <strong>of</strong> this RFP, including all its schedules, annexures, and all amendments or<br />

modifications;<br />

“Procurer(s)” shall mean the entity (ies) as specified in Clause 1.1 <strong>of</strong> this RFP;<br />

“Project Company” shall mean the company, incorporated by the Bidder as per Indian laws,<br />

in accordance with Clause 2.2.8;<br />

“Qualification Requirements” shall mean the qualification requirements as set <strong>for</strong>th in<br />

Clause 2.1 <strong>of</strong> this RFP;<br />

“Qualified Bidder(s)” shall mean the Bidder(s) who, after evaluation <strong>of</strong> their Non Financial<br />

Bid as per Clauses 3.2 and 3.3, stand qualified <strong>for</strong> opening and evaluation <strong>of</strong> their Financial<br />

Bid;<br />

“Quoted Capacity Charges” shall mean the sum total <strong>of</strong> Quoted Escalable Capacity Charges<br />

and Quoted Non Escalable Capacity Charges;<br />

“Quoted Energy Charges” shall mean the sum total <strong>of</strong> Quoted Escalable Energy Charges and<br />

Quoted Non Escalable Energy Charges;<br />

“Quoted Escalable Energy Charges” shall mean the charges quoted by the Bidder in column<br />

no. 7 or column no. 9 <strong>of</strong> its Financial Bid as per Format 4.10 <strong>of</strong> this RFP (applicable as per<br />

Clause 2.4.1.1(B)(ix) <strong>of</strong> this RFP);<br />

“Quoted Escalable Capacity Charges” shall mean the charges as quoted by the Bidder in<br />

column no. 5 <strong>of</strong> its Financial Bid as per Format 4.10 <strong>of</strong> this RFP;<br />

“Quoted Escalable Fuel Handling Charges” shall mean the charges as quoted by the Bidder<br />

in column no. 15 <strong>of</strong> its Financial Bid as per Format 4.10 <strong>of</strong> this RFP (applicable as per Clause<br />

2.4.1.1(B) (ix) <strong>of</strong> this RFP);<br />

1 In case the Successful Bidder is supplying power from more than one generation source, then separate PPAs<br />

need to be executed <strong>for</strong> each such generation source.<br />

………..[Insert name <strong>of</strong> Procurer / Authorized Representative ] Page 11