04.08.2013 Views

Guidelines for determination of tariff & SBD for ... - Ministry of Power

Guidelines for determination of tariff & SBD for ... - Ministry of Power

Guidelines for determination of tariff & SBD for ... - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Standard RFP <strong>for</strong> ….[Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case - 1<br />

j. Please provide the following documents:<br />

__________________________________<br />

(i) Copy <strong>of</strong> the Memorandum and Articles <strong>of</strong> Association and certificate <strong>of</strong><br />

incorporation or other equivalent organizational document (as applicable in the<br />

case <strong>of</strong> a <strong>for</strong>eign company), including their amendments, certified by the<br />

company secretary <strong>of</strong> the Bidding Company/each Member <strong>of</strong> the Consortium<br />

(as Attachment 1)<br />

(ii) Authority letter in favor <strong>of</strong> …………… [Insert “Procurer” / “Authorized<br />

Representative” as applicable] from the Bidding Company/each Member <strong>of</strong> the<br />

Consortium (as per <strong>for</strong>mat specified below) authorizing …………… [Insert<br />

“Procurer” / “Authorized Representative” as applicable] to seek reference<br />

from their respective bankers, lenders, financing institutions and any other<br />

person as given below in the Format <strong>for</strong> Authorization, as per Clause 2.1.7 <strong>of</strong><br />

the RFP.<br />

k. (Insert this point in case <strong>of</strong> Bidder being a Bidding Company) Whether the Bidder<br />

wishes to <strong>for</strong>m a Project Company <strong>for</strong> the supply <strong>of</strong> power? …………… (Yes/No)<br />

l. (Insert this point in case <strong>of</strong> Bidder being a Bidding Company) Whether the Bidder has<br />

already <strong>for</strong>med a Project Company:……………………(Yes/No)<br />

If Yes, the details <strong>of</strong> the Project Company as follows:<br />

i) Name <strong>of</strong> the Project Company …………………..<br />

ii) Name <strong>of</strong> the Equity Holder ……………………<br />

iii) Type and No. <strong>of</strong> Shares owned ……………………<br />

iv) % <strong>of</strong> equity holding …………………….<br />

v) Extent <strong>of</strong> voting control(%) ……………………..<br />

vi) Date <strong>of</strong> incorporation ……………………<br />

Details <strong>of</strong> Ownership Structure:<br />

Details <strong>of</strong> persons owning 10% or more <strong>of</strong> the total paid up equity <strong>of</strong> the Bidding Company<br />

/ each Member <strong>of</strong> the Consortium.<br />

Name <strong>of</strong> the Bidding Company/ Member <strong>of</strong> the Consortium: …………….<br />

Status <strong>of</strong> equity holding as on ……………………….<br />

Name <strong>of</strong><br />

Equity<br />

Holder<br />

1.<br />

2.<br />

3.<br />

Type and Number<br />

<strong>of</strong> Shares owned<br />

% <strong>of</strong> Equity Holding Extent <strong>of</strong> Voting<br />

Control (%)<br />

………..[Insert name <strong>of</strong> Procurer / Authorized Representative ] Page 77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!