1.3.1 Scope<br />
Standard RFP <strong>for</strong> ….[Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case - 1<br />
This bidding process is being carried out under Case – 1 bidding procedure as<br />
mentioned in the Bidding <strong>Guidelines</strong>, according to which the Bidder is free to choose<br />
any power generation source, any power generation technology and fuel type <strong>for</strong> supply<br />
<strong>of</strong> power. Further, all Bidders shall indicate the source <strong>of</strong> power generation from where<br />
the Contracted Capacity would be delivered and the type <strong>of</strong> fuel which shall be used.<br />
Supply <strong>of</strong> power is permitted from operational power plants or from power plants<br />
proposed to be commissioned on or be<strong>for</strong>e the Scheduled Delivery Date, subject to<br />
availability <strong>of</strong> reliable power over the term <strong>of</strong> the PPA.<br />
Brief scope <strong>of</strong> power procurement is given as under:<br />
Sr.<br />
No<br />
Scope Details<br />
1. Contract Period (in<br />
years)<br />
2. Requisitioned<br />
Capacity (MW)<br />
3. Minimum Bid<br />
Capacity 2<br />
……………. years [Insert no. <strong>of</strong> years depending<br />
upon medium/long term requirement]<br />
…………… MW [Insert the total aggregate<br />
quantum <strong>of</strong> power procurement in MW] <strong>for</strong><br />
……………….. [Insert base load / diurnal load /<br />
seasonal load] supply <strong>of</strong> power.<br />
During the evaluation <strong>of</strong> Bids and based on the<br />
competitiveness <strong>of</strong> the bid process, the<br />
Procurer/Authorized Representative retains the<br />
right to increase or decrease the Requisitioned<br />
Capacity by a quantum <strong>of</strong> twenty percent (20%) <strong>of</strong><br />
the quantum indicated herein.<br />
…………… MW [Insert capacity in MW]<br />
4. Load Requirement ………………… [Insert “Base Load” / “Seasonal<br />
Load” / “Diurnal Load”, as applicable]<br />
5. [Insert in case <strong>of</strong><br />
seasonal or diurnal<br />
requirement]<br />
Duration <strong>of</strong> <strong>Power</strong><br />
Procurement<br />
[Insert the following as applicable.]<br />
“For seasonal requirement:<br />
Duration <strong>of</strong> power requirement in months:……….<br />
[Insert names <strong>of</strong> months in the year]” throughout<br />
the Contract Period<br />
“For diurnal requirement:<br />
Duration <strong>of</strong> power requirement in hours: from ...<br />
hrs to …hrs and from … hrs to … hrs [Insert hours<br />
<strong>of</strong> start and end <strong>of</strong> supply <strong>of</strong> power in a day] in<br />
each day on daily basis through out the Contract<br />
2 The Minimum Bid Capacity shall be decided by the Procurer/ Authorized Representative, which may generally<br />
be the lower <strong>of</strong> the two values: 10% <strong>of</strong> the Requisitioned Capacity or 50 MW. However, the Procurer/Authorized<br />
Representative shall be free to determine any quantum <strong>of</strong> power as the Minimum Bid Capacity.<br />
………..[Insert name <strong>of</strong> Procurer / Authorized Representative ] Page 17