Standard PPA <strong>for</strong> … [Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case -1<br />
“Unscheduled<br />
Interchange” or “UI”<br />
common control <strong>of</strong> such company;<br />
shall have the meaning ascribed thereto in Rule 24 <strong>of</strong> the CERC<br />
(Terms and Conditions <strong>of</strong> <strong>tariff</strong>) Regulations 2004 as amended or<br />
revised from time to time;<br />
In case the <strong>Power</strong> Station and the Procurer(s) being within the same<br />
state, the Unscheduled Interchange shall be regulated by the<br />
respective SERC regulations;<br />
“Unscheduled Outage” shall mean an outage that is not a Scheduled Outage and is <strong>for</strong> the<br />
purpose <strong>of</strong> per<strong>for</strong>ming work on specific plant and equipments, which<br />
work could not be postponed till the next Scheduled Outage;<br />
“US $” or “USD” or<br />
“Dollar” [<strong>for</strong> imported<br />
fuel only]<br />
shall mean United States Dollars, the lawful currency <strong>of</strong> the United<br />
States <strong>of</strong> America;<br />
"Week" shall mean a calendar week commencing from 00:00 hours <strong>of</strong><br />
Monday, and ending at 24:00 hours <strong>of</strong> the following Sunday;<br />
"Wheeling Charges" or<br />
“Transmission<br />
Charges”<br />
1.2 Interpretation<br />
shall mean the charges ………………[Insert as applicable – “to be<br />
paid by the Seller and reimbursed by the Procurer(s)” / “ paid by the<br />
Procurer(s)”] as transmission <strong>tariff</strong> <strong>for</strong> usage <strong>of</strong> intervening CTU<br />
networks <strong>for</strong> the transmission <strong>of</strong> power from the Injection Point up to<br />
the Delivery Point, as approved by the Appropriate Commission<br />
(excluding the charges <strong>for</strong> the STU network or charges <strong>of</strong> STU<br />
system operation or SLDC Charges, if any);<br />
Save where the contrary is indicated, any reference in this Agreement to:<br />
1.2.1 “Agreement" shall be construed as including a reference to its Schedules, Appendices and<br />
Annexures;<br />
1.2.2 An "Article", a "Recital", a "Schedule” and a “paragraph / clause" shall be construed as a<br />
reference to an Article, a Recital, a Schedule and a paragraph/clause respectively <strong>of</strong> this<br />
Agreement;<br />
1.2.3 A “crore” means a reference to ten million (10,000,000) and a “lakh” means a reference<br />
to one tenth <strong>of</strong> a million (1,00,000);<br />
1.2.4 An "encumbrance" shall be construed as a reference to a mortgage, charge, pledge, lien or<br />
other encumbrance securing any obligation <strong>of</strong> any person or any other type <strong>of</strong> preferential<br />
arrangement (including, without limitation, title transfer and retention arrangements)<br />
having a similar effect;<br />