Standard RFP <strong>for</strong> ….[Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case - 1<br />

be <strong>for</strong> the quantity <strong>of</strong> fuel, required upto the phase <strong>of</strong> the power station from<br />

which the power is proposed to be supplied, at Normative Availability <strong>for</strong> the<br />

term <strong>of</strong> the PPA.<br />

In case the Bidder proposes use <strong>of</strong> blended coal, the Bidder shall be required to<br />

meet the criteria separately <strong>for</strong> domestic & imported coal as provided in the<br />

Qualifying Requirements in the ratio <strong>of</strong> the blending proposed.<br />

In case <strong>of</strong> imported coal, the Bidder shall have either acquired mines having<br />

proven reserves <strong>for</strong> at least fifty percent (50%) <strong>of</strong> the quantity <strong>of</strong> coal required to<br />

generate power from the power station at Normative Availability <strong>for</strong> the total<br />

installed capacity OR shall have fuel supply agreement <strong>for</strong> at least fifty percent<br />

(50%) <strong>of</strong> the quantity <strong>of</strong> fuel required <strong>for</strong> a term <strong>of</strong> at least five (5) years or the<br />

term <strong>of</strong> the PPA (which ever is less) to generate power from the generation<br />

source <strong>for</strong> the total installed capacity <strong>for</strong> the term <strong>of</strong> the PPA.<br />

In case <strong>of</strong> domestic gas, the Bidder shall have made firm arrangements <strong>for</strong> fuel<br />

tie up by way <strong>of</strong> long term fuel supply agreement <strong>for</strong> the period & quantity as<br />

per Government <strong>of</strong> India guidelines <strong>for</strong> gas allocation, required upto the phase <strong>of</strong><br />

power station from which the power is proposed to be supplied..<br />

In case <strong>of</strong> RLNG, the Bidder shall have made firm arrangements <strong>for</strong> fuel tie up<br />

by way <strong>of</strong> fuel supply agreement <strong>for</strong> at least fifty percent (50%) <strong>of</strong> the quantity<br />

<strong>of</strong> fuel required <strong>for</strong> a term <strong>of</strong> at least five (5) years or the term <strong>of</strong> the PPA (which<br />

ever is less) to generate power from the generation source <strong>for</strong> the total installed<br />

capacity <strong>for</strong> the term <strong>of</strong> the PPA.<br />

c) Water: The Bidder shall have obtained in-principle approval from the concerned<br />

state irrigation department or any other relevant authority, as may be applicable, <strong>for</strong><br />

the quantity <strong>of</strong> water required <strong>for</strong> the power station.<br />

d) Environmental Clearance: The Bidder shall have submitted the requisite proposal,<br />

<strong>for</strong> the environmental clearance, to the concerned administrative authority<br />

responsible <strong>for</strong> according final approval in the central / state govt. as the case may<br />

be.<br />

e) Forest Clearance: (if applicable <strong>for</strong> the land <strong>of</strong> power station) The Bidder shall have<br />

submitted the requisite proposal, <strong>for</strong> the <strong>for</strong>est clearance, to the concerned<br />

administrative authority responsible <strong>for</strong> according final approval in the central /<br />

state govt., as the case may be.<br />

f) If the identified generation source is an existing power station, the Bidder shall<br />

submit the documentary evidence regarding commissioning <strong>of</strong> the power station<br />

and available surplus capacity equivalent to the capacity <strong>of</strong>fered in its Bid in lieu <strong>of</strong><br />

the requirements specified above in this Clause 2.1.2.2 (a) to (e).<br />

g) If the Bidder is a Trading Licensee, it shall have executed exclusive power purchase<br />

agreement(s) <strong>for</strong> the quantity <strong>of</strong> power <strong>of</strong>fered in its Bid and shall provide a copy <strong>of</strong><br />

the same as part <strong>of</strong> its Bid.<br />

The documentary evidence as per Format 4.6 (B) shall be duly certified by Managing<br />

Director / Chief Executive Officer / Director/Manager, being a full time director on the<br />

………..[Insert name <strong>of</strong> Procurer / Authorized Representative ] Page 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!