Standard RFP <strong>for</strong> ….[Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case - 1<br />

applicable to Quoted<br />

Escalable Overseas<br />

Transportation Charges<br />

15. Annual escalation rate<br />

applicable to Quoted<br />

Escalable Inland<br />

Transportation Charges<br />

16. Annual escalation rate<br />

applicable to Quoted<br />

Escalable Fuel Handling<br />

Charges<br />

17. Rupee appreciation/<br />

depreciation rate with respect<br />

to US$ applied to Quoted<br />

Escalable and Non Escalable<br />

Energy Charges and<br />

Escalable and Non-Escalable<br />

Oversea Transportation<br />

Charge (Rs. / US$)<br />

Domestic (Pipeline) Gas<br />

18. Annual escalation rate<br />

applicable to Quoted<br />

Escalable Energy Charges<br />

19. Annual escalation rate<br />

applicable to Quoted<br />

Escalable Inland<br />

Transportation Charges<br />

applicable on the day which is seven (7) days<br />

prior to Bid Deadline<br />

This shall be the rate notified by CERC<br />

applicable on the day which is seven (7) days<br />

prior to Bid Deadline<br />

This shall be the rate notified by CERC<br />

applicable on the day which is seven (7) days<br />

prior to Bid Deadline<br />

This shall be the rate notified by CERC<br />

applicable on the day which is seven (7) days<br />

prior to Bid Deadline<br />

This shall be the rate notified by CERC<br />

applicable on the day which is seven (7) days<br />

prior to Bid Deadline<br />

This shall be the rate notified by CERC<br />

applicable on the day which is seven (7) days<br />

prior to Bid Deadline<br />

The factor at Sl. No. 1 in the above table shall be applied from the Scheduled Delivery Date<br />

and the factors at Sl. No. 3, 4, 5, 6, 7, 8, 9, 10, 12, 13, 14, 15, 16, 17, 18 and 19 shall be applied<br />

from the Bid Deadline (as applicable). Further all the factors mentioned in Sl No. 1, 4, 5, 6 15<br />

and 16 shall be applied as at the mid point <strong>of</strong> each Contract Year.<br />

3.4.5 Applicable transmission charges shall be added to such escalated Quoted Tariff as<br />

described below.<br />

3.4.6 Transmission Charges<br />

The Injection Point specified by the Bidder in its Financial Bid shall be used to add the<br />

applicable transmission charges.<br />

a) In case <strong>of</strong> Injection Point being a CTU Interface, applicable transmission<br />

charges as specified in Format 5.10 from such CTU Interface up to the<br />

Delivery Point with appropriate escalation shall be added to the escalated<br />

Quoted Tariff.<br />

b) Transmission Charges, if any, <strong>for</strong> transmitting power from the<br />

Interconnection Point to the Injection Point shall be borne by the Seller and<br />

no transmission charges <strong>for</strong> such intrastate transmission link shall neither be<br />

added <strong>for</strong> evaluation nor shall be payable by the Procurer(s) during the term<br />

<strong>of</strong> the PPA.<br />

………..[Insert name <strong>of</strong> Procurer / Authorized Representative ] Page 54