Standard RFP <strong>for</strong> ….[Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case - 1<br />
applicable to Quoted<br />
Escalable Overseas<br />
Transportation Charges<br />
15. Annual escalation rate<br />
applicable to Quoted<br />
Escalable Inland<br />
Transportation Charges<br />
16. Annual escalation rate<br />
applicable to Quoted<br />
Escalable Fuel Handling<br />
Charges<br />
17. Rupee appreciation/<br />
depreciation rate with respect<br />
to US$ applied to Quoted<br />
Escalable and Non Escalable<br />
Energy Charges and<br />
Escalable and Non-Escalable<br />
Oversea Transportation<br />
Charge (Rs. / US$)<br />
Domestic (Pipeline) Gas<br />
18. Annual escalation rate<br />
applicable to Quoted<br />
Escalable Energy Charges<br />
19. Annual escalation rate<br />
applicable to Quoted<br />
Escalable Inland<br />
Transportation Charges<br />
applicable on the day which is seven (7) days<br />
prior to Bid Deadline<br />
This shall be the rate notified by CERC<br />
applicable on the day which is seven (7) days<br />
prior to Bid Deadline<br />
This shall be the rate notified by CERC<br />
applicable on the day which is seven (7) days<br />
prior to Bid Deadline<br />
This shall be the rate notified by CERC<br />
applicable on the day which is seven (7) days<br />
prior to Bid Deadline<br />
This shall be the rate notified by CERC<br />
applicable on the day which is seven (7) days<br />
prior to Bid Deadline<br />
This shall be the rate notified by CERC<br />
applicable on the day which is seven (7) days<br />
prior to Bid Deadline<br />
The factor at Sl. No. 1 in the above table shall be applied from the Scheduled Delivery Date<br />
and the factors at Sl. No. 3, 4, 5, 6, 7, 8, 9, 10, 12, 13, 14, 15, 16, 17, 18 and 19 shall be applied<br />
from the Bid Deadline (as applicable). Further all the factors mentioned in Sl No. 1, 4, 5, 6 15<br />
and 16 shall be applied as at the mid point <strong>of</strong> each Contract Year.<br />
3.4.5 Applicable transmission charges shall be added to such escalated Quoted Tariff as<br />
described below.<br />
3.4.6 Transmission Charges<br />
The Injection Point specified by the Bidder in its Financial Bid shall be used to add the<br />
applicable transmission charges.<br />
a) In case <strong>of</strong> Injection Point being a CTU Interface, applicable transmission<br />
charges as specified in Format 5.10 from such CTU Interface up to the<br />
Delivery Point with appropriate escalation shall be added to the escalated<br />
Quoted Tariff.<br />
b) Transmission Charges, if any, <strong>for</strong> transmitting power from the<br />
Interconnection Point to the Injection Point shall be borne by the Seller and<br />
no transmission charges <strong>for</strong> such intrastate transmission link shall neither be<br />
added <strong>for</strong> evaluation nor shall be payable by the Procurer(s) during the term<br />
<strong>of</strong> the PPA.<br />
………..[Insert name <strong>of</strong> Procurer / Authorized Representative ] Page 54