Standard PPA <strong>for</strong> … [Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case -1<br />

11 ARTICLE 11: EVENTS OF DEFAULT AND TERMINATION<br />

11.1 Seller Event <strong>of</strong> Default<br />

11.1.1 The occurrence and continuation <strong>of</strong> any <strong>of</strong> the following events, unless any such event<br />

occurs as a result <strong>of</strong> a Force Majeure Event or a breach by Procurer(s) <strong>of</strong> its obligations<br />

under this Agreement or a Procurer Event <strong>of</strong> Default, shall constitute a Seller Event <strong>of</strong><br />

Default:<br />

(i) the failure to commence supply <strong>of</strong> power to the Procurer(s) up to the Contracted<br />

Capacity, relevant to the Revised Scheduled Delivery Date(s) or the Scheduled Delivery<br />

Date, as the case may be, by the end <strong>of</strong> ……... [Insert the period specified in the proviso<br />

to Article 4.8.2], or<br />

(ii) after the Delivery Date, the interruption <strong>of</strong> power supply by the Seller <strong>for</strong> a continuous<br />

period <strong>of</strong> ……. [Insert “two (2) Months” in case <strong>of</strong> long term procurement/ “fifteen (15)<br />

Days” in case <strong>of</strong> medium term procurement] and such default is not rectified within …….<br />

[Insert “thirty (30) Days ” in case <strong>of</strong> long term procurement/ “five (05) Days” in case <strong>of</strong><br />

medium term procurement] from the receipt <strong>of</strong> first notice from the Procurer(s) in this<br />

regard, or<br />

(iii) [Insert this in case <strong>of</strong> base load procurement] After the Delivery Date, the<br />

……………… [Insert “Seller” if Seller is NOT a Trading Licensee, or insert<br />

“Developer” if Seller is a Trading Licensee] fails to achieve Normative Availability <strong>for</strong> a<br />

period <strong>of</strong> ………… (………….) [Insert “twelve (12)” incase <strong>of</strong> long term procurement/<br />

“six (6)” in case <strong>of</strong> medium-term procurement] consecutive or non-consecutive Months<br />

within any continuous period <strong>of</strong> …………………… [Insert‘thirty six (36) Months’ in<br />

case <strong>of</strong> long-term procurement / insert ‘twelve (12) Months’ in case <strong>of</strong> medium term<br />

procurement]; OR<br />

[Insert this in case <strong>of</strong> peak load or seasonal load procurement] After the commencement<br />

<strong>of</strong> supply <strong>of</strong> power, the ………………. [Insert “Seller” if Seller is NOT a Trading<br />

Licensee, or insert “Developer” if Seller is a Trading Licensee] fails to achieve …..<br />

[Insert “ninety-five percent (95%) <strong>of</strong> Normative Availability”] <strong>for</strong> a period <strong>of</strong> ………..<br />

(……..) Months [Insert number <strong>of</strong> months separately in the case <strong>of</strong> medium term or long<br />

term procurement] consecutive or non-consecutive Months within any continuous period<br />

<strong>of</strong> …………. (………….) Months [Insert number <strong>of</strong> months separately in the case <strong>of</strong><br />

medium term or long term procurement]; or<br />

(iv) the Seller fails to make any payment (a) <strong>of</strong> an amount exceeding Rupees One (1) Crore in<br />

aggregate required to be made to Procurer(s) under this Agreement, within three (3)<br />

Months after the Due Date <strong>of</strong> undisputed invoice(s) /demand raised by the said<br />

Procurer(s) on the Seller or (b) <strong>of</strong> an amount up to Rupees ….. [Insert amount] required<br />

to be made to Procurer(s) under this Agreement within six (6) Months after the Due Date<br />

<strong>of</strong> undisputed invoice(s)/ demand; or<br />

(v) any <strong>of</strong> the representations and warranties made by the Seller in Schedule 7 <strong>of</strong> this<br />

Agreement; being found to be untrue or inaccurate. Further, in addition to the above, any<br />

<strong>of</strong> representations made or the undertakings submitted by the Successful Bidder at the<br />

time <strong>of</strong> submission <strong>of</strong> the Bid being found to be breached or inaccurate, including but not<br />