Sr.<br />

No<br />

Standard RFP <strong>for</strong> ….[Insert ‘medium’ or ‘long’, as applicable] term power procurement under Case - 1<br />

Scope Details<br />

9. Transmission Losses The transmission losses from the Interconnection<br />

Point to the Delivery Point shall be borne by the<br />

Procurer(s).<br />

10. Arranging<br />

Transmission Access<br />

………….. [Insert ‘Seller(s)’ or ‘Procurer(s)’, as<br />

applicable] shall be responsible <strong>for</strong> arranging<br />

transmission access from the Injection Point to the<br />

Delivery Point. Such arrangement shall be as per<br />

the regulations specified by the Appropriate<br />

Commission, as amended from time to time.<br />

The ………….. [Insert ‘Seller(s)’ or ‘Procurer(s)’,<br />

as applicable] shall initiate action <strong>for</strong> development<br />

<strong>of</strong> the requisite transmission system from Injection<br />

Point to the Delivery Point by co-coordinating with<br />

the CTU and concerned STU in accordance with<br />

the relevant regulations <strong>of</strong> the Appropriate<br />

Commission.<br />

The Seller shall be wholly responsible to arrange<br />

transmission access from the Interconnection Point<br />

to the Injection Point.<br />

The Procurer(s) shall be wholly responsible to<br />

arrange transmission access from the station<br />

switchyard <strong>of</strong> the generation source in case <strong>of</strong> the<br />

generating source being in the same state as that <strong>of</strong><br />

the Procurer(s).<br />

11. Transmission Charges [Insert in case <strong>of</strong> Procurer(s) arranging<br />

transmission access: “For transmission <strong>of</strong> power<br />

from the Injection Point to the Delivery Point, the<br />

Procurer(s) shall be responsible to enter into a<br />

commercial arrangement with the CTU/ STU, as<br />

the case may be, to bear the transmission charges as<br />

notified by the CERC/ SERC, as the case may be,<br />

from time to time.”]<br />

[Insert in case <strong>of</strong> Seller(s) arranging transmission<br />

access: “For transmission <strong>of</strong> power from the<br />

Injection Point to the Delivery Point, the Seller(s)<br />

shall be responsible to enter into a commercial<br />

arrangement with the CTU/STU, as the case may<br />

be, to bear the transmission charges as notified by<br />

the CERC/SERC, as the case may be, from time to<br />

time. Further, the Seller(s) shall then claim the<br />

reimbursement <strong>of</strong> such Transmission Charges from<br />

the Procurer(s).”]<br />

Transmission Charges, if any, <strong>for</strong> transmitting<br />

power from the Interconnection Point to the<br />

………..[Insert name <strong>of</strong> Procurer / Authorized Representative ] Page 19