Installation & Operation Manual - StellarSupport - John Deere
Installation & Operation Manual - StellarSupport - John Deere
Installation & Operation Manual - StellarSupport - John Deere
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CHAPTER<br />
3<br />
Overview<br />
Chapt er 3<strong>Installation</strong><br />
The following steps must be completed to install a Sidekick Pro ISO injection system:<br />
1. Select and plumb the point of injection. See page 12.<br />
a. Install carrier and chemical injection check valves.<br />
b. Install in-line mixer.<br />
2. Mount the Sidekick Pro ISO injection module or tank. See page 17.<br />
3. Mount the Sidekick Pro ISO injection pump. See page 17.<br />
4. Plumb the Sidekick Pro ISO pump and injection lines into the main carrier line at point of injection. See<br />
page 19.<br />
5. Install the closed calibration system. See page 20.<br />
6. Plumb the recommended rinse system. See page 21.<br />
7. Connect the Sidekick Pro ISO injection pump to CANbus. See page 23.<br />
8. Connect the Sidekick Pro ISO pump to source of electrical power. See page 23.<br />
The following sections provide detailed information and procedure to assist with completing the above steps.<br />
Contact a local Raven dealer for assistance or questions during the installation procedure.<br />
FIGURE 1. Example Sidekick Pro ISO Injection System<br />
<strong>Manual</strong> No. 016-0171-509 Rev. B 11