Injection Pump Vacuum Switch<br />
To replace the vacuum switch (P/N 063-0171-035):<br />
Replacement Parts<br />
1. Disable and shutdown any automatic product control features of the Sidekick Pro ISO injection system and<br />
turn off the vehicle when replacing the vacuum switch assembly.<br />
2. Disconnect the vacuum switch connector from the motor control cabling. Be careful to keep dust, debris, or<br />
liquid chemicals which may seep from the injection pump head from contaminating the cable connections.<br />
3. Loosen the vacuum switch while securing the connected fitting to prevent damage to the pump head.<br />
4. Apply RectorSeal ® or equivalent thread sealant to the new vacuum switch and thread into the pump head.<br />
5. If necessary, slide the protective covering on the vacuum switch back slightly to expose the hex surface for<br />
tightening the vacuum switch body.<br />
6. Tighten the vacuum switch body two or three quarter turns to secure the vacuum switch.<br />
Note: Do not over tighten the pressure transducer. Overtightening the pressure transducer may<br />
damage the pump head.<br />
7. Be sure to replace the protective cover over the flow switch before operating the pump.<br />
Injection Pump Flow Monitor Sensor<br />
WARNING<br />
Always use caution when performing<br />
maintenance or servicing an injection pump or<br />
system which has been previously pressurized.<br />
Wear appropriate protective equipment to<br />
prevent contact with hazardous chemicals and<br />
rinse the chemical system as instructed by the<br />
chemical manufacturer prior to performing<br />
maintenance.<br />
WARNING<br />
Hazardous chemicals may be under pressure<br />
even if the pump has not been in service<br />
recently. Before replacing any components on<br />
the injection pump, thoroughly rinse the<br />
injection pump with clean water to remove<br />
excess chemical residue.<br />
Perform the following procedure to replace the flow monitor sensor (P/N 063-0173-492).<br />
<strong>Manual</strong> No. 016-0171-509 Rev. B 69<br />
8