Installation & Operation Manual - StellarSupport - John Deere
Installation & Operation Manual - StellarSupport - John Deere
Installation & Operation Manual - StellarSupport - John Deere
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Chapter 3<br />
FIGURE 4. Check Valves and In-Line Mixer<br />
Port A<br />
Port A<br />
Carrier Check Valve<br />
Recirculation/Priming<br />
Check Valve<br />
Note: Be sure to install the check valves with the flow direction indicator pointing in the direction of<br />
chemical flow.<br />
TABLE 1. Check Valve Sizing and Selection Chart<br />
Recirculation and<br />
Priming Check<br />
Valve a<br />
Injection Point<br />
Check valve 12 PSI<br />
[82.74 kPa]<br />
Carrier Check Valve<br />
Port B<br />
Port B<br />
Raven Part No. “A” NPT “B” NPT<br />
333-0011-100 1/2” (F) 1/2” (M)<br />
333-0011-102 1/2” (F) 1/2” (M)<br />
333-0011-090 1” 1”<br />
333-0011-091 1-1/4” 1-1/4”<br />
333-0011-093 2” 2”<br />
333-0011-094 3” 3”<br />
333-0011-095 4” 4”<br />
a. Check valve features a 0.046” hole necessary for bleeding during<br />
priming procedures.<br />
14 Sidekick Pro ISO <strong>Installation</strong> & <strong>Operation</strong> <strong>Manual</strong><br />
Port A<br />
Port A<br />
Injection Point<br />
Check Valve<br />
Stainless Steal Mixer<br />
Assembly<br />
Port B<br />
Port B