19.08.2013 Views

Installation & Operation Manual - StellarSupport - John Deere

Installation & Operation Manual - StellarSupport - John Deere

Installation & Operation Manual - StellarSupport - John Deere

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 3<br />

FIGURE 4. Check Valves and In-Line Mixer<br />

Port A<br />

Port A<br />

Carrier Check Valve<br />

Recirculation/Priming<br />

Check Valve<br />

Note: Be sure to install the check valves with the flow direction indicator pointing in the direction of<br />

chemical flow.<br />

TABLE 1. Check Valve Sizing and Selection Chart<br />

Recirculation and<br />

Priming Check<br />

Valve a<br />

Injection Point<br />

Check valve 12 PSI<br />

[82.74 kPa]<br />

Carrier Check Valve<br />

Port B<br />

Port B<br />

Raven Part No. “A” NPT “B” NPT<br />

333-0011-100 1/2” (F) 1/2” (M)<br />

333-0011-102 1/2” (F) 1/2” (M)<br />

333-0011-090 1” 1”<br />

333-0011-091 1-1/4” 1-1/4”<br />

333-0011-093 2” 2”<br />

333-0011-094 3” 3”<br />

333-0011-095 4” 4”<br />

a. Check valve features a 0.046” hole necessary for bleeding during<br />

priming procedures.<br />

14 Sidekick Pro ISO <strong>Installation</strong> & <strong>Operation</strong> <strong>Manual</strong><br />

Port A<br />

Port A<br />

Injection Point<br />

Check Valve<br />

Stainless Steal Mixer<br />

Assembly<br />

Port B<br />

Port B

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!