19.08.2013 Views

Installation & Operation Manual - StellarSupport - John Deere

Installation & Operation Manual - StellarSupport - John Deere

Installation & Operation Manual - StellarSupport - John Deere

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Application Modes and Pump <strong>Operation</strong><br />

<strong>Operation</strong><br />

The following sections outline control features and application modes which may be used with an injection<br />

system.<br />

Application Modes<br />

The following modes are available for rate control of injected chemicals:<br />

Cal/Prime. This mode allows for chemical to be primed to the outlet of the pump and to validate pump<br />

performance through a 1 oz. calibration test. Refer to the Prime the Injection Pump section on page 41 or the<br />

Calibrate the Injection Pump section on page 43 for details on the Prime/Cal mode.<br />

Automatic. This mode allows for the injection pump to run at a target application rate (oz./ac or L/ha) by<br />

compensating for changes in section width and speed.<br />

<strong>Manual</strong>. This mode allows for the injection pump to be run at a fixed flow rate (oz./min. or L/min.). The<br />

application rate (oz./ac. or L/ha) does not compensate for section width and speed changes. This mode is<br />

typically used for testing purposes.<br />

Rx. This mode allows the system to automatically change the rate of injected chemical based upon a<br />

prescription map loaded on the VT display.<br />

The following procedure outlines the general operation of Sidekick Pro ISO and controlling an injected<br />

chemical in the manual, automatic and Rx modes.<br />

Note: Perform pump priming and calibration checks before beginning to apply an injected chemical. Be<br />

sure to verify console calibration settings for each injection pump before operating the Sidekick<br />

Pro ISO pump(s).<br />

Setting the Pump for Field <strong>Operation</strong><br />

1. Check injection system hand valves and ensure that product will be routed to the point of injection and<br />

boom valves.<br />

2. Toggle the master boom switch to the off position.<br />

3. Turn product control on for each of the injected chemical(s) on the control console.<br />

4. Select manual or automatic or Rx pump mode for each Sidekick Pro ISO pump. Refer to the Application<br />

Modes section on page 45 for details on each pump mode.<br />

5. Increase vehicle speed and toggle the master boom switch to the on position. The Sidekick Pro ISO<br />

injection pump will begin injecting product into the main product line at the injection point.<br />

Note: If the pump does not turn on or an error is displayed, verify calibration values in the control<br />

console, make sure the system has a rate cal, speed, and an active boom section, and verify that<br />

the pump is primed. See Chapter 6, Injection Diagnostics and Troubleshooting, if the pump still<br />

does not respond.<br />

6. To shut the injection pump off:<br />

a. Toggle the master boom switch to the off position.<br />

<strong>Manual</strong> No. 016-0171-509 Rev. B 45<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!