CHAPTER<br />

5<br />

Chapt er 5<strong>Operation</strong><br />

Sidekick Pro ISO Priming and Calibration<br />

Before starting application of injected products, perform the following procedures to ensure the system is<br />

properly calibrated and ready for chemical application:<br />

1. Verify control console setup<br />

2. Prime the injection pump<br />

3. Calibrate the injection pump<br />

Verify Control Console Settings<br />

Review the Virtual Terminal Calibration section on page 31 and verify that the correct settings for the chemical<br />

injection product are programmed for the correct product node or product number.<br />

Prime the Injection Pump<br />

1. Open the hand valve(s) between the supply tank and injection pump.<br />

2. Set the hand valve on the injection pump outlet to recirculate product back to the supply tank.<br />

3. Lift the plunger handle on the pump calibrator to the top of the calibration cylinder.<br />

4. Verify the following conditions are present:<br />

a. Vacuum pressure for the injected product must be less than 5.5 PSI [37.92 kPa]<br />

b. Injection pump discharge pressure must be less than 12 PSI [82.7 kPa]<br />

c. Injection product pump mode must be set to “CAL/PRM” (Calibration/Prime)<br />

d. Injection pump product master switch must be set to on<br />

<strong>Manual</strong> No. 016-0171-509 Rev. B 41