Installation & Operation Manual - StellarSupport - John Deere
Installation & Operation Manual - StellarSupport - John Deere
Installation & Operation Manual - StellarSupport - John Deere
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Chapter 2<br />
Sidekick Pro ISO Features<br />
Closed Calibration System<br />
Calibrating chemical injection pumps is necessary for accurate chemical injection applications. The Sidekick<br />
Pro ISO closed calibration system allows the operator to perform calibration or system tests without catching or<br />
handling dangerous chemicals.<br />
Priming<br />
An automatic priming feature ensures the pump is correctly primed and ready for operation when the operator<br />
is ready to apply product.<br />
Pump Calibrator<br />
The pump calibrator provides a quick tool to check pump efficiency and verify that the pump is ready for<br />
operation.<br />
FIGURE 1. Pump Calibrator<br />
4 Sidekick Pro ISO <strong>Installation</strong> & <strong>Operation</strong> <strong>Manual</strong>