Chapter 5<br />
5. On the VT display, set the pump mode on the main product control screen to “Cal/Prime.”<br />
Tools<br />
6. Select the Tools icon and select the diagnostics icon to access the Product Diagnostics screen.<br />
7. Select the Master Switch icon to toggle the master switch to the On position and select the ‘Start Prime’<br />
button from the soft keys area.<br />
8. Verify that the hand valve is set to the recirculation mode and select the ‘OK’ button.<br />
9. The priming procedure will run until the controller detects the pump has primed. If the pump is unable to<br />
prime, the console will end the priming procedure after two minutes and display a “prime time-out”<br />
message.<br />
Note: If the console displays an error message during the priming process, verify that the conditions<br />
listed in step 4 are present. If the problem continues, see Chapter 6, Injection Diagnostics and<br />
Troubleshooting, to resolve issues during the pump priming process.<br />
Press the “Stop Prime” button to stop the priming procedure at any time. If the pump fails to prime<br />
successfully after the first attempt, restart the priming procedure. If the pump is still unable to prime<br />
successfully, refer to Chapter 6, Injection Diagnostics and Troubleshooting, for assistance<br />
diagnosing issues with the injection system.<br />
10. When the display shows the prime complete message, touch the ‘Stop Prime’ button to stop the priming<br />
process.<br />
Note: Before beginning an application, verify that the hand valve is set to the injection position and select<br />
the OK button on the VT display to proceed. If the hand valve is not set properly, the pump will not<br />
inject chemical into the main product line during an application.<br />