Calibrate the Injection Pump<br />

<strong>Operation</strong><br />

Prior to starting a field operation with an injected chemical, verify that the pump is properly calibrated and<br />

operational by performing a pump calibration.<br />

1. Ensure the pump is primed as described in the Prime the Injection Pump section on page 41 before<br />

proceeding with the calibration process.<br />

2. Remove the cover from the injection pump calibrator.<br />

3. Press the calibrator all the way down and replace the calibrator cover.<br />

FIGURE 1. Sidekick Pro ISO Pump Calibrator<br />

Remove<br />

Cover<br />

Push Plunger<br />

Down<br />

4. Verify the following conditions are present:<br />

a. Pump pressure less than 12 PSI [82.7 kPa]<br />

b. Vacuum pressure for the injected product must be less than 5.5 PSI [37.92 kPa]<br />

c. Injection product pump mode must be set to “CAL/PRM” (Calibrate/Prime)<br />

d. Injection pump product master switch must be set to on<br />

Install<br />

Cover<br />

Calibration<br />

Window<br />

5. On the VT display, set the pump mode on the main product control screen to “PRM/CAL.”<br />

Tools<br />

<strong>Manual</strong> No. 016-0171-509 Rev. B 43<br />