Calibrate the Injection Pump<br />
<strong>Operation</strong><br />
Prior to starting a field operation with an injected chemical, verify that the pump is properly calibrated and<br />
operational by performing a pump calibration.<br />
1. Ensure the pump is primed as described in the Prime the Injection Pump section on page 41 before<br />
proceeding with the calibration process.<br />
2. Remove the cover from the injection pump calibrator.<br />
3. Press the calibrator all the way down and replace the calibrator cover.<br />
FIGURE 1. Sidekick Pro ISO Pump Calibrator<br />
Remove<br />
Cover<br />
Push Plunger<br />
Down<br />
4. Verify the following conditions are present:<br />
a. Pump pressure less than 12 PSI [82.7 kPa]<br />
b. Vacuum pressure for the injected product must be less than 5.5 PSI [37.92 kPa]<br />
c. Injection product pump mode must be set to “CAL/PRM” (Calibrate/Prime)<br />
d. Injection pump product master switch must be set to on<br />
Install<br />
Cover<br />
Calibration<br />
Window<br />
5. On the VT display, set the pump mode on the main product control screen to “PRM/CAL.”<br />
Tools<br />
<strong>Manual</strong> No. 016-0171-509 Rev. B 43<br />
5