16.1 Location<br />

Sea laid feeding cable will be laid between the separate<br />

turbines and the two trans<strong>for</strong>mer stations and between<br />

the trans<strong>for</strong>mer stations and land. The trans<strong>for</strong>mer<br />

stations are planned to be located centrally in the wind<br />

farm and the distance between them to land will be<br />

about 30 km.<br />

During the early consultation, a number of different<br />

alternative landing points were presented (points were<br />

the cable reaches land), see map below.<br />

From these landing points, cables will be laid to the<br />

CABLE LAYING 165<br />

connection points (the transmission grid).<br />

The connection of the wind farm to the grid is<br />

planned in two phases. In phase 1 on land, 340 MW is<br />

planned to be connected to the grid at Trelleborg North<br />

and in phase 2, 300 MW is planned to be connected to<br />

the connection point Arrie (Västra Kärrstorp). These<br />

two stations are existing trans<strong>for</strong>mer stations.