- Page 1 and 2:
This environmental impact assessmen
- Page 3 and 4:
Sweden Offshore Wind AB Hammarby Fa
- Page 5 and 6:
CONTENTS 8.3 Comparative discussion
- Page 7 and 8:
CONTENTS 12.10 Recreation and outdo
- Page 9 and 10:
6 PREAMBLE AND READER NOTES 1. Prea
- Page 11 and 12:
8 PREAMBLE AND READER NOTES Here, t
- Page 13 and 14:
10 SUMMARY 2. Summary Introduction
- Page 15 and 16: 12 SUMMARY any protected values or
- Page 18 and 19: Background
- Page 20 and 21: have less impact on the landscape p
- Page 22 and 23: Consultation Report
- Page 24 and 25: through Ms. Eva-Lena Olsson and Mr.
- Page 26 and 27: Description of the Wind Farm
- Page 28 and 29: 5.2. Localisation The designated ar
- Page 30 and 31: As examples, the technique behind t
- Page 32 and 33: not yet been tested by the wind pow
- Page 34 and 35: ) Biological surveys Extensive inve
- Page 36 and 37: During the construction phase, the
- Page 38 and 39: The wind turbines emit an aerodynam
- Page 40 and 41: trical and will therefore not conta
- Page 42 and 43: Project economics
- Page 44 and 45: Time table
- Page 46 and 47: Alternative locations
- Page 48 and 49: there are technical and economic li
- Page 50 and 51: Miscellaneous An application for th
- Page 52 and 53: ased on data measured in 2003. Cond
- Page 54 and 55: heritage, meaning that any exploita
- Page 56 and 57: mentary seabed is mobile due to ice
- Page 58 and 59: Alternative layout/scope
- Page 60 and 61: sary. An example that has been stud
- Page 62 and 63: The Zero Alternative
- Page 64: • The mining of approximately 840
- Page 69 and 70: 66 PRESENTATION OF THE AREA 11.1.1
- Page 71 and 72: 68 PRESENTATION OF THE AREA varies
- Page 73 and 74: 70 PRESENTATION OF THE AREA 1995).
- Page 75 and 76: 72 PRESENTATION OF THE AREA cont. f
- Page 77 and 78: 74 PRESENTATION OF THE AREA The win
- Page 79 and 80: 76 PRESENTATION OF THE AREA Month T
- Page 81 and 82: 78 PRESENTATION OF THE AREA Species
- Page 83 and 84: 80 PRESENTATION OF THE AREA regular
- Page 85 and 86: 82 PRESENTATION OF THE AREA The cod
- Page 87 and 88: 84 PRESENTATION OF THE AREA 11.6.3
- Page 89 and 90: 86 PRESENTATION OF THE AREA Distrib
- Page 91 and 92: 88 PRESENTATION OF THE AREA to acqu
- Page 93 and 94: 90 PRESENTATION OF THE AREA Of the
- Page 95 and 96: 92 PRESENTATION OF THE AREA Bird sp
- Page 97 and 98: 94 PRESENTATION OF THE AREA Night a
- Page 99 and 100: 96 PRESENTATION OF THE AREA d) Surv
- Page 101 and 102: 98 PRESENTATION OF THE AREA During
- Page 103 and 104: 100 PRESENTATION OF THE AREA Indivi
- Page 105 and 106: 102 PRESENTATION OF THE AREA tion w
- Page 107 and 108: 104 PRESENTATION OF THE AREA In the
- Page 109 and 110: 106 PRESENTATION OF THE AREA Since
- Page 111 and 112: 108 PRESENTATION OF THE AREA Shippi
- Page 113 and 114: 110 PRESENTATION OF THE AREA 11.11.
- Page 115 and 116:
112 PRESENTATION OF THE AREA These
- Page 117 and 118:
114 PRESENTATION OF THE AREA to pre
- Page 119 and 120:
116 CONSEQUENSES OF THE WIND FARM 1
- Page 121 and 122:
118 CONSEQUENSES OF THE WIND FARM I
- Page 123 and 124:
120 CONSEQUENSES OF THE WIND FARM 1
- Page 125 and 126:
122 CONSEQUENSES OF THE WIND FARM 1
- Page 127 and 128:
124 CONSEQUENSES OF THE WIND FARM 1
- Page 129 and 130:
126 CONSEQUENSES OF THE WIND FARM s
- Page 131 and 132:
128 CONSEQUENSES OF THE WIND FARM
- Page 133 and 134:
130 CONSEQUENSES OF THE WIND FARM 1
- Page 135 and 136:
132 CONSEQUENSES OF THE WIND FARM J
- Page 137 and 138:
134 CONSEQUENSES OF THE WIND FARM 1
- Page 139 and 140:
136 CONSEQUENSES OF THE WIND FARM c
- Page 141 and 142:
138 CONSEQUENSES OF THE WIND FARM A
- Page 143 and 144:
140 CONSEQUENSES OF THE WIND FARM I
- Page 145 and 146:
142 CONSEQUENSES OF THE WIND FARM p
- Page 147 and 148:
144 CONSEQUENSES OF THE WIND FARM 1
- Page 149 and 150:
146 CONSEQUENSES OF THE WIND FARM 1
- Page 152 and 153:
Cumulative effects
- Page 154 and 155:
and the track at low visibility is
- Page 156 and 157:
13.3 Current conditions/ saltwater
- Page 158 and 159:
Control program
- Page 160 and 161:
14.2 Fish The wind farm’s possibl
- Page 162 and 163:
Collected judgement
- Page 164:
15.3.2 The operational phase The fa
- Page 167 and 168:
164 CABLE LAYING 16. Cable laying I
- Page 169 and 170:
166 CABLE LAYING 16.2 Design The tr
- Page 171 and 172:
168 CABLE LAYING There will be rest
- Page 173 and 174:
170 BIBLIOGRAPHY 17. Bibliography A
- Page 175 and 176:
172 BIBLIOGRAPHY ratoriet, Lysekil.
- Page 177 and 178:
174 FTABLE OF ATTACHMENTS 19. Table
- Page 179 and 180:
1 Wind farm, view from Trelleborg,
- Page 181 and 182:
Wind farm, view from Trelleborg, 30
- Page 183 and 184:
Wind farm, view from ships bridge,
- Page 185 and 186:
7 Wind farm, view from Møn, 30 km,
- Page 187:
9 Wind farm, view from Rügen, 42 k