02.09.2013 Views

This environmental impact assessment for Kriegers flak ... - Vattenfall

This environmental impact assessment for Kriegers flak ... - Vattenfall

This environmental impact assessment for Kriegers flak ... - Vattenfall

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

24 DESCRIPTION OF THE WIND FARM<br />

5. Description of the wind farm<br />

<strong>This</strong> chapter contains a description of the wind farm (number of turbines, positioning, tech-<br />

nique etc.), the different phases (development, building, operation and dismantling) and the<br />

physical <strong>impact</strong> on the surroundings (<strong>for</strong> example noise and vibrations). The chapter does not<br />

investigate the consequences of the <strong>impact</strong> that will occur, but is merely a factual description<br />

of this <strong>impact</strong>. The consequences are described in Chapter 12.<br />

5.1. Scope<br />

Sweden Offshore plans to build a wind farm with<br />

maximum 128 wind turbines with a capacity of 5 MW<br />

each. The erection of the wind farm is planned to take<br />

place in two phases during two seasons. The number<br />

of turbines to be erected during each phase depends on<br />

the seabed conditions, the type of foundations chosen<br />

and the design of the cable routing.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!