sary. An example that has been studied and presented<br />

at the extended consultation, is the building of 86<br />

turbines with a capacity of 5MW, i.e. a total capacity<br />

of 430 MW.<br />

9.4 Smaller turbines (less capacity)<br />

If smaller turbines are used, a larger area must be utilised<br />

or, otherwise, the same amount of energy cannot<br />

be produced.<br />

As described above, it is difÞ cult to increase the<br />

area used, but if one choses instead to produce less energy<br />

within the same area, then the Þ nancial proÞ tability<br />

will be a limiting factor. As also described above,<br />

a conÞ guration resulting in less energy production<br />

can be more economical if only one connection point<br />

is required. An example that has been studied and<br />

presented at the extended consultation is the building<br />

of 88 turbines with a capacity of 3.6 MW, i.e. a total<br />

capacity of 316.8 MW.<br />

ALTERNATIVE LAYOUT/SCOPE 57<br />

A further reason <strong>for</strong> using turbines with a lower<br />

capacity would be that 5 MW turbines are not yet in<br />

serial production.<br />

9.5 Larger turbines (higher capacity)<br />

Sweden Offshore plans to use the turbine model with<br />

the highest capacity available on the market at the<br />

time that procurement commences. <strong>This</strong> is assuming<br />

that the technology has been proven and tested. The<br />

construction is planned <strong>for</strong> 2007 and 2008 and it is<br />

currently not likely that a turbine with higher capacity<br />

than 5 MW will exist and/or be proven and tested.<br />

However, if this should be the case, Sweden Offshore<br />

is open to using a turbine with a higher capacity than<br />

5 MW.