18. Abbreviations and explanations<br />

<strong>Kriegers</strong> Flak I = the project that is developed on the<br />

German side of <strong>Kriegers</strong> Flak by the group (Ostsee<br />

Offshore Wind AG)<br />

<strong>Kriegers</strong> Flak II = the project that is being developed<br />

on the Swedish side of <strong>Kriegers</strong> Flak by Sweden Offshore<br />

IOW = Institut fur Ostsee<strong>for</strong>schung, Warnemunde<br />

IfAÖ = Institut fur Angewante Ökologi<br />

EIS = Environmental Impact <strong>assessment</strong><br />

EC = The Swedish Environmental Code<br />

BSH = Bundesamt für Seechiffahrt und Hydrographie<br />

GL = Germanische Lloyd<br />

ABBREVIATIONS AND EXPLANATIONS 173<br />

Capacity (energy per time unit)<br />

1 kilowatt (kW) = 1 000 W<br />

1 megawatt (MW) = 1 000 kW<br />

1 gigawatt (GW) = 1 000 000 kW<br />

1 terawatt (TW) = 1 000 000 000 kW<br />

Energy (capacity times time)<br />

1 kilowatt-hour (kWh) = 1 000 Wh<br />

1 megawatt-hour (MWh) = 1 000 kWh<br />

1 gigawatt-hour (GWh) = 1000 000 kWh<br />

1 terawatt-hour (TWh) = 1 000 000 000 kWh