32 DESCRIPTION OF THE WIND FARM<br />
• The upper part of the tower<br />
• The nacelle<br />
• The rotor and the rotor blades<br />
The different parts will be transported to the site<br />
with special installation vessels that are equipped with<br />
cranes.<br />
Depending on the weather, the installation of each<br />
wind turbine usually takes one to two days. As weather<br />
conditions usually are favourable, it will probably take<br />
place during the period April to September.<br />
The installation is planned to be carried out in two<br />
phases during two calendar years. There are four reasons<br />
<strong>for</strong> this.<br />
Firstly, one can monitor the <strong>environmental</strong> consequences<br />
during the Þ rst phase to determine if something<br />
unexpected has occurred.<br />
Secondly, one can make use of the knowledge<br />
gained during installation to optimise the construction<br />
of the foundations.<br />
Thirdly, it will be natural to divide the cable laying<br />
into two phases as just over 300 MW can be connected<br />
to each of the two trans<strong>for</strong>mer stations (read more<br />
about this in the report “Elektrisk integrering av <strong>Kriegers</strong><br />
Flak II I det Sydsvenska elnätet”, attachment 13.1).<br />
Finally, only monopiles will be used during the Þ rst<br />
phase, resulting in a fairly simple installation process.