(PESIA) Weg naar Zee 2D Seismic - Staatsolie
(PESIA) Weg naar Zee 2D Seismic - Staatsolie
(PESIA) Weg naar Zee 2D Seismic - Staatsolie
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
P-all consultants <strong>Staatsolie</strong> Maatschappij Suriname N.V.<br />
<strong>PESIA</strong> <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> <strong>2D</strong> <strong>Seismic</strong> 2012<br />
P O C<br />
5.4 GEO(HYDRO)LOGY, GEOMORPHOLOGY AND SOILS<br />
Clearing and<br />
preparation of<br />
trails will result<br />
in the removal of<br />
peat, if present,<br />
and maybe some<br />
of the upper layer<br />
of the clay, loam<br />
or sand soil .<br />
Release of drilling<br />
waste of the<br />
explosions<br />
3 3 3<br />
Do not create unnecessary deep<br />
trails, thus limiting soil disturbance<br />
to a minimum<br />
Use old existing trails as much as<br />
possible.<br />
Select the least productive soils in<br />
the area of the <strong>Seismic</strong> trails<br />
Limit earth moving and soil<br />
disturbance to the minimum<br />
Restore the site upon termination of<br />
the drilling explosion holes and<br />
explosion<br />
Cmpensate farmers f crops or<br />
animals are negatively impacted<br />
5.5 VISUAL RESOURCES, TOPOGRAPHY AND LANDSCAPE<br />
Trails and <strong>2D</strong><br />
seismic drilling<br />
sites in the wetland<br />
area will be visible<br />
from the air and<br />
large scale clearing<br />
within the project<br />
area will draw<br />
attention of people<br />
flying over the<br />
area<br />
2 2 2<br />
Plan trails and drilling sites in such a<br />
way that a minimum of<br />
vegetation/forest clearing is required<br />
Use only the initial trails and do not<br />
widen the trails during operation<br />
Where possible, use the already<br />
existing trails and canals (fish hole)<br />
trajectories<br />
112<br />
3<br />
4